Project Summary

Download CSV
days
2765
Total Activities
45.8%
% Complete (Labor)
95
Milestones
185
Critical
136
Above Target
9.6%
1282
At/Below Target
90.4%
17.9
Avg Duration (Days)
DCMA 14-Point Assessment
14 metrics
No baseline has been provided. Upload a baseline file to activate metrics 12–14.
Metric 1: Missing Predecessors
PASS when ≤ 5.0% · WARN ≤ 10.0% · FAIL otherwise
Missing Predecessors — activities with no driving predecessor logic (≤ 5.0% target)
#1
Missing Predecessors
9 / 2765 (0.3%)
PASS
Metric 2: Missing Successors
PASS when ≤ 5.0% · WARN ≤ 10.0% · FAIL otherwise
Missing Successors — activities with no successor logic (≤ 5.0% target)
#2
Missing Successors
93 / 2765 (3.4%)
PASS
Metric 3: Lags
PASS when ≤ 5.0% · WARN ≤ 10.0% · FAIL otherwise
Lags — relations with positive lag (≤ 5.0% target)
#3
Lags
383 / 5232 (7.3%)
WARNING
Metric 4: Leads (Neg. Lag)

Binary metric — any occurrence triggers FAIL. No configurable thresholds.

Leads — relations with negative lag / lead (0% target)
#4
Leads (Neg. Lag)
0 / 5232 (0.0%)
PASS
Metric 5: Relationship Types
PASS when ≥ 90.0% FS · WARN ≥ 80.0% · FAIL otherwise
Relationship Types — % of Finish-to-Start relations (≥ 90.0% target)
#5
Relationship Types
4019 / 5232 (76.8%)
FAIL
Metric 6: Hard Constraints
PASS when ≤ 5.0% · WARN ≤ 10.0% · FAIL otherwise
Hard Constraints — activities with mandatory date constraints (≤ 5.0% target)
#6
Hard Constraints
58 / 2765 (2.1%)
PASS
Metric 7: High Float
Flag if float > 44d · PASS ≤ 5.0% · WARN ≤ 10.0%
High Float — activities with total float > 44.0 days (≤ 5.0% target)
#7
High Float
658 / 2765 (23.8%)
FAIL
Metric 8: Negative Float

Binary metric — any occurrence triggers FAIL. No configurable thresholds.

Negative Float — activities with negative total float (0% target)
#8
Negative Float
69 / 2765 (2.5%)
FAIL
Metric 9: High Duration
At 44 this follows Target Duration (now 30); any other value overrides it.
Flag if duration > 44d · PASS ≤ 5.0% · WARN ≤ 10.0%
High Duration — open activities longer than 30 working days (≤ 5.0% target)
#9
High Duration
136 / 2765 (4.9%)
PASS
Metric 10: Invalid Dates

Binary metric — any occurrence triggers FAIL. No configurable thresholds.

Invalid Dates — activities with date logic issues vs status date (0% target)
#10
Invalid Dates
38 / 2765 (1.4%)
FAIL
Metric 11: Missing Resources
PASS when ≤ 5.0% · WARN ≤ 10.0% · FAIL otherwise
Missing Resources — activities with no resource assignments (≤ 5.0% target)
#11
Missing Resources
484 / 2765 (17.5%)
FAIL
Metric 13: CPLI
PASS when CPLI ≥ 1.00 · WARN ≥ 0.95 · FAIL otherwise

Baseline required. Upload baseline

CPLI — Critical Path Length Index (≥ 1.0 target, requires baseline)
#13
CPLI
—
N_A
Metric 14: BEI
PASS when BEI ≥ 0.95 · WARN ≥ 0.90 · FAIL otherwise

Baseline required. Upload baseline

BEI — Baseline Execution Index (≥ 0.95 target, requires baseline)
#14
BEI
—
N_A
Project NameACME RESIN BLEND PLANT EPC LEVEL III Schedule -LIVE Update 29-May
Data Date29-May-2026
Start21-Jul-2025
Finish02-Jul-2027
Total Duration711 days
Target Duration30 days
Avg Activity Duration17.9 days
Total Labor Hours201,949.84 h
Actual Labor Hours92,426.99 h
Remaining Labor Hours109,522.85 h

Milestones 95

Download CSV
Activity IDNameTypeDateWBS
EK000KM120Bridging Engineering CompleteStart/Finish Milestone01-Aug-2025DEMO-L3-EPC-1.1.4
PK002IC260CWA02 - Distributed Control System: ROS (Software Design completion)Start/Finish Milestone01-Jun-2027DEMO-L3-EPC-1.2.7.3.4
PK009ME540CWA09 - Tank Mixers: ROS (Side entry)Start/Finish Milestone01-Mar-2027DEMO-L3-EPC-1.2.7.3.9
PK000ML100POs Issued - LLI EquipmentStart/Finish Milestone02-Jul-2026DEMO-L3-EPC-1.1.2
EK000ML270Model Review 60% - Solids HandlingStart/Finish Milestone02-Jun-2026DEMO-L3-EPC-1.1.1
PK002ME630CWA02/04 - API 610 Pumps: ROSStart/Finish Milestone03-Apr-2027DEMO-L3-EPC-1.2.7.3.4
EK000ML280Model Review 90% - Solids HandlingStart/Finish Milestone03-Aug-2026DEMO-L3-EPC-1.1.1
EK000KM130Detailed Engineering StartStart/Finish Milestone04-Aug-2025DEMO-L3-EPC-1.1.4
EK000ML170P&ID IFCStart/Finish Milestone04-Aug-2026DEMO-L3-EPC-1.1.1
PK001ME450CWA01/03/04/05 - Centrifugal Sealless Pumps (API 685): ROSStart/Finish Milestone04-Feb-2027DEMO-L3-EPC-1.2.7.3.1
PK000IC495CWA00 - Relief Valves & Rupture Disks: ROSStart/Finish Milestone04-May-2027DEMO-L3-EPC-1.2.7.3.10
PK002CV930CWA02 - Laboratory (Modular): ROSStart/Finish Milestone04-May-2027DEMO-L3-EPC-1.2.7.3.4
PK000SE540CWA00 - Safety Equipment: ROSStart/Finish Milestone05-Apr-2027DEMO-L3-EPC-1.2.7.3.10
EK000KM230Kick-Off MeetingStart/Finish Milestone05-Aug-2025DEMO-L3-EPC-1.1.4
PK009ME530CWA09 - Shop Fabricated Storage Tanks: ROSStart/Finish Milestone05-Mar-2027DEMO-L3-EPC-1.2.7.3.9
EK000ML180Initial MTOStart/Finish Milestone06-Aug-2026DEMO-L3-EPC-1.1.1
EK000ML120P&ID IFHStart/Finish Milestone07-Feb-2026DEMO-L3-EPC-1.1.1
PK000IC2350CWA00 - Level switches: ROSStart/Finish Milestone07-Mar-2027DEMO-L3-EPC-1.2.7.3.10
EK000ML200Client Model Review 90% - Stage 3Start/Finish Milestone07-Sep-2026DEMO-L3-EPC-1.1.1
PK000IC2330CWA00 - Transmitter: ROSStart/Finish Milestone08-Apr-2027DEMO-L3-EPC-1.2.7.3.10
PK000SE550CWA00 - Fire Protection Equipment: ROSStart/Finish Milestone08-Apr-2027DEMO-L3-EPC-1.2.7.3.10
PK000ML140Final Vendor Data Receipt - Non-LLI EquipmentStart/Finish Milestone08-Jun-2027DEMO-L3-EPC-1.1.2
EK000ML230P&ID IFR 02Start/Finish Milestone09-Jan-2026DEMO-L3-EPC-1.1.1
PK002CV920CWA02 - Control Room (Modular): ROSStart/Finish Milestone09-Mar-2027DEMO-L3-EPC-1.2.7.3.4
EK000ML240HAZOP Review 2 CompleteStart/Finish Milestone10-Apr-2026DEMO-L3-EPC-1.1.1
PK007EL650CWA07 - Power Distribution Center: ROSStart/Finish Milestone10-Apr-2027DEMO-L3-EPC-1.2.7.3.7
PK000SE570CWA00 - Fire Deluge system: ROSStart/Finish Milestone10-Mar-2027DEMO-L3-EPC-1.2.7.3.10
EK000ML260Model Review 30% - Solids HandlingStart/Finish Milestone11-Dec-2025DEMO-L3-EPC-1.1.1
PK004ME910CWA04 - Blender Mixers & Shear Mixers Pumps: ROSStart/Finish Milestone11-Feb-2027DEMO-L3-EPC-1.2.7.3.3
PK004ME940CWA04 - Resin Blender: ROSStart/Finish Milestone11-Feb-2027DEMO-L3-EPC-1.2.7.3.3
EK000ML330P&ID IFD 3 (including Chiller Package , Steam Generation, Instrument air, Carbon bed.)Start/Finish Milestone11-Jun-2026DEMO-L3-EPC-1.1.1
PK000IC995CWA00 - Corolis Flow Meter: ROSStart/Finish Milestone11-Mar-2027DEMO-L3-EPC-1.2.7.3.10
PK000IC895CWA00 - Level Gauges: ROSStart/Finish Milestone11-Mar-2027DEMO-L3-EPC-1.2.7.3.4
PK004IC270CWA04 - GC Analyzer and Analyzer Shelter: ROSStart/Finish Milestone11-May-2027DEMO-L3-EPC-1.2.7.3.3
PK004ME920CWA04 - Solids Handling System: ROSStart/Finish Milestone12-Apr-2027DEMO-L3-EPC-1.2.7.3.3
PK000ML170Vendor Drawings ApprovedStart/Finish Milestone12-Oct-2026DEMO-L3-EPC-1.1.2
EK000ML190Contractor Readiness Review - Stage 3Start/Finish Milestone13-Aug-2026DEMO-L3-EPC-1.1.1
PK001ME430CWA01/02/03/04/05 - Filters: ROSStart/Finish Milestone13-Feb-2027DEMO-L3-EPC-1.2.7.3.1
PK000EL200CWA00 - Electrical Heat Tracing: ROSStart/Finish Milestone13-Jan-2027DEMO-L3-EPC-1.2.7.3.10
PK007EL670CWA07 - Non-Segregated LV Bus Duct: ROSStart/Finish Milestone13-Oct-2026DEMO-L3-EPC-1.2.7.3.7
PK000ML160Final Vendor Data Receipt - LLI EquipmentStart/Finish Milestone14-Apr-2027DEMO-L3-EPC-1.1.2
PK002CV940CWA02 - Retain Room: ROSStart/Finish Milestone14-Apr-2027DEMO-L3-EPC-1.2.7.3.4
PK005ME510CWA05 - Truck / Rail Scales: ROSStart/Finish Milestone14-Mar-2027DEMO-L3-EPC-1.2.7.3.5
PK006ME500CWA06 - Instrument Air Generation Package: ROSStart/Finish Milestone14-May-2027DEMO-L3-EPC-1.2.7.3.6
EK000ML220Final MTOStart/Finish Milestone14-Oct-2026DEMO-L3-EPC-1.1.1
PK009ME555CWA09 - Static Mixers: ROSStart/Finish Milestone15-Feb-2027DEMO-L3-EPC-1.2.7.3.9
EK000ML290Contractor Readiness Review - Stage 2 - Part 2Start/Finish Milestone15-Jun-2026DEMO-L3-EPC-1.1.1
PK000ML130Delivery to Site Complete - Non-LLI EquipmentStart/Finish Milestone15-Jun-2027DEMO-L3-EPC-1.1.2
PK002ME600CWA07 - Chiller Package (New Cooling System): ROSStart/Finish Milestone15-Jun-2027DEMO-L3-EPC-1.2.7.3.7
PK003ME410CWA03 - Tank Mixers: ROS (Side Entry)Start/Finish Milestone15-Mar-2027DEMO-L3-EPC-1.2.7.3.2
EK000ML160Client Model Review 60% - Stage 2 - Part 1Start/Finish Milestone15-May-2026DEMO-L3-EPC-1.1.1
EK000ML310P&ID IFD 2 (Excluding Chiller Package , Steam Generation, Instrument air, Carbon bed.)Start/Finish Milestone15-May-2026DEMO-L3-EPC-1.1.1
EK000ML210Overall Plot Plan IFCStart/Finish Milestone15-Sep-2026DEMO-L3-EPC-1.1.1
PK004ME950CWA04/05 - PD Pumps: ROSStart/Finish Milestone16-Dec-2026DEMO-L3-EPC-1.2.7.3.3
PK005CV430CWA05 - Operator Shelter (RACK SHACK) (Modular): ROSStart/Finish Milestone16-Mar-2027DEMO-L3-EPC-1.2.7.3.5
EK000KM160Detailed Engineering CompleteStart/Finish Milestone16-Oct-2026DEMO-L3-EPC-1.1.4
PK007EL690CWA07 - AC UPS & DC Battery Charger Package: ROS (combined with PDC)Start/Finish Milestone17-Apr-2027DEMO-L3-EPC-1.2.7.3.7
PK000IC2320CWA00 - Safety Instrumented System: ROSStart/Finish Milestone17-Dec-2026DEMO-L3-EPC-1.2.7.3.10
PK002ME610CWA02 - Sample Lab Transfer Package: ROSStart/Finish Milestone18-Nov-2026DEMO-L3-EPC-1.2.7.3.4
PK000ML110POs Issued - Non-LLI EquipmentStart/Finish Milestone20-Aug-2026DEMO-L3-EPC-1.1.2
PK000IC2360CWA00 - Orifice Flow Meter: ROSStart/Finish Milestone20-Jan-2027DEMO-L3-EPC-1.2.7.3.10
EK000ML250HAZOP Review - Solids HandlingStart/Finish Milestone20-Nov-2025DEMO-L3-EPC-1.1.1
EK000KM100EPC StartStart/Finish Milestone21-Jul-2025DEMO-L3-EPC-1.1.4
PK000SE560CWA00 - Foam System Package: ROSStart/Finish Milestone21-Mar-2027DEMO-L3-EPC-1.2.7.3.10
PK007EL680CWA07 - LV Transformer 34.5kV/0.48kV: ROSStart/Finish Milestone21-Sep-2026DEMO-L3-EPC-1.2.7.3.7
PK000IC695CWA00 - Pressure Gauges: ROSStart/Finish Milestone22-Feb-2027DEMO-L3-EPC-1.2.7.3.10
PK000IC795CWA00 - Temperature Gauges: ROSStart/Finish Milestone22-Feb-2027DEMO-L3-EPC-1.2.7.3.10
PK004ME960CWA04 - Antioxidant Tank Mixer (Top Entry): ROSStart/Finish Milestone22-Jan-2027DEMO-L3-EPC-1.2.7.3.3
EK000ML320Vendor Hazop - Chiller Package , Steam Generation, Instrument air, Carbon bed, Hot water heaterStart/Finish Milestone22-May-2026DEMO-L3-EPC-1.1.1
EK000ML150Contractor Readiness Review - Stage 2 - Part 1Start/Finish Milestone24-Apr-2026DEMO-L3-EPC-1.1.1
PK001ME440CWA01/05 - Loading / Unloading Arms: ROSStart/Finish Milestone24-Jan-2027DEMO-L3-EPC-1.2.7.3.1
PK001IC595CWA01/02/04/05/07 - Telecom System: ROSStart/Finish Milestone24-May-2027DEMO-L3-EPC-1.2.7.3.1
PK000PI540CWA00 - Piping Special Supports: ROSStart/Finish Milestone25-Feb-2027DEMO-L3-EPC-1.2.7.3.10
PK000PI530CWA00 - Piping Specialty Items: ROSStart/Finish Milestone25-Jan-2027DEMO-L3-EPC-1.2.7.3.10
PK000ML120Delivery to Site Complete - LLI EquipmentStart/Finish Milestone25-May-2027DEMO-L3-EPC-1.1.2
PK004ME930CWA04/06 - Drums / Vessels: ROSStart/Finish Milestone25-Oct-2026DEMO-L3-EPC-1.2.7.3.3
EK000ML100P&ID IFR 01Start/Finish Milestone25-Sep-2025DEMO-L3-EPC-1.1.1
EK000ML110Client's Case 1 ApprovalStart/Finish Milestone26-Dec-2025DEMO-L3-EPC-1.1.1
EK000ML130HAZOP Review 1 CompleteStart/Finish Milestone26-Feb-2026DEMO-L3-EPC-1.1.1
PK005CV440CWA05 - Railway Loading Rack Canopy / Platform (PEB): ROSStart/Finish Milestone26-Jan-2027DEMO-L3-EPC-1.2.7.3.5
EK000ML300Client Model Review 60% - Stage 2 - Part 2Start/Finish Milestone26-Jun-2026DEMO-L3-EPC-1.1.1
PK000IC515CWA00 - Control Valves & Pressure Regulators: ROSStart/Finish Milestone26-May-2027DEMO-L3-EPC-1.2.7.3.10
PK000IC525CWA00 - Actuated On/Off Valves: ROSStart/Finish Milestone26-May-2027DEMO-L3-EPC-1.2.7.3.10
PK002ME620CWA02 - Drum / Tote Filling Equipment: ROSStart/Finish Milestone27-Nov-2026DEMO-L3-EPC-1.2.7.3.4
PK007EL660CWA07 - MV Outdoor Switchgear 34.5kV: ROSStart/Finish Milestone28-Dec-2026DEMO-L3-EPC-1.2.7.3.7
PK005CV450CWA05 - Truck Loading Canopy Platform: ROSStart/Finish Milestone28-Jan-2027DEMO-L3-EPC-1.2.7.3.5
PK004PI520CWA04 - Pigging Manifold Package: ROSStart/Finish Milestone28-Nov-2026DEMO-L3-EPC-1.2.7.3.3
PK007ME420CWA07 - Steam Generation Boiler Package: ROSStart/Finish Milestone29-Jan-2027DEMO-L3-EPC-1.2.7.3.7
PK007ME430CWA07 - Hot Water Heater : ROSStart/Finish Milestone29-Jan-2027DEMO-L3-EPC-1.2.7.3.7
EK000KM140Site Mobilization - Commence Site PrepStart/Finish Milestone29-Jul-2025DEMO-L3-EPC-1.1.4
EK000ML140P&ID IFD 1Start/Finish Milestone30-Apr-2026DEMO-L3-EPC-1.1.1
PK002IC250CWA02 - Distributed Control System: ROS (Hard ware Design completion)Start/Finish Milestone30-Nov-2026DEMO-L3-EPC-1.2.7.3.4
PK002CV910CWA02 - Crossdock and Filling Structure: ROS (Metallic Building - Suppl , Inst)Start/Finish Milestone31-Dec-2026DEMO-L3-EPC-1.2.7.3.4
PK006CV210CWA06 - VNB Canopy: ROS (combined with Cross dock)Start/Finish Milestone31-Dec-2026DEMO-L3-EPC-1.2.7.3.6
PK000IC2340CWA00 - Radar Type Level Transmitter: ROSStart/Finish Milestone31-Mar-2027DEMO-L3-EPC-1.2.7.3.10

Activity Status Breakdown

Download CSV
1362
Not Started
49.3%
56
In Progress
2.0%
1347
Completed
48.7%

Critical Path Analysis

days
Download CSV
Method used: Total Float ≤ 0.0d
98
Critical
290
Near-Critical (1-5d)
Float Distribution
0 days29
1-5 days290
6-10 days85
11-20 days160
20+ days854
Critical Activities
Activity IDNameTotal Float (d)StartFinishDuration (d)
EK000CV850CWA00 - CSA LOE Activities: IDC, Inputs, Reviews, Updates from FEED, Meetings, etc.0.004-Aug-202516-Oct-2026438
EK000EL720CWA00 - Electrical LOE Activities (IDC, Inputs, Reviews, Updates from FEED, Meetings, etc.)0.004-Aug-202516-Oct-2026438
EK000IC1980CWA00 - Instruments LOE Activities (IDC, Inputs, Reviews, Updates from FEED, Meetings, etc.)0.004-Aug-202516-Oct-2026438
EK000ME200CWA00 - Mech / HVAC LOE Activities (IDCs, Inputs to other disc., Updates from FEED, Meetings)0.004-Aug-202516-Oct-2026438
EK000PI750CWA00 - Piping LOE Activities (IDC, Inputs, Reviews, Updates from FEED, Meetings, etc.)0.004-Aug-202516-Oct-2026438
EK000PM210Project Management, Project Controls, Eng Management & PM Support LOE Activities0.004-Aug-202516-Oct-2026438
EK000PR100CWA00 - Process LOE Activities: (IDC, Inputs, Updates from FEED, Meetings, Reviews, etc.)0.004-Aug-202516-Oct-2026438
EK000SE140CWA00 - Safety LOE Activities (IDC, Inputs, Reviews, Updates from FEED, Meetings, etc.)0.004-Aug-202516-Oct-2026438
PK004ME550CWA04 - Blender Mixers & Shear Mixers Pumps: Receipt of Initial Vendor Data (for Invoice Claim)-39.020-Apr-202604-Jun-202645
EK000IC1360CWA00 - TBE - Telecom Systems: IFI-110.015-May-202612-Jun-202628
EK000IC1430CWA00 - TBE - Analyzers: IFI-8.015-May-202612-Jun-202628
PK001IC550CWA01/02/04/05/07 - Telecom System: TBE / CBE / Final Negotiation-110.015-May-202619-Jun-202635
PK004IC160CWA04 - GC Analyzer and Analyzer Shelter: TBE / CBE / Final Negotiation-8.015-May-202626-Jun-202642
PK004ME150CWA04 - Solids Handling System: Vendor Drawings Review & Approval-35.015-May-202620-Aug-202697
PC13870Contractor to Provide a list of documents to be submitted0.029-May-202601-Jun-20263
PK000IC150CWA00 - Safety Instrumented System: Receipt of Initial Vendor Data (for Invoice Claim)-11.029-May-202611-Jun-202613
PK000IC2240CWA00 - Level switches Receipt of Initial Vendor Data (for Invoice Claim)-4.029-May-202615-Jun-202617
PK000IC460CWA00 - Safety Instrumented System: Receipt of Initial Vendor Data (for Model review)-15.029-May-202611-Jun-202613
PK001ME260CWA01/05 - Loading / Unloading Arms: Receipt of Initial Vendor Data (for Invoice Claim)-13.029-May-202624-Jun-202626
PK002CV150CWA02 - Laboratory (Modular): Receipt of Initial Vendor Data (for Invoice Claim)-4.029-May-202624-Jul-202656
PK002CV250CWA02 - Control Room (Modular): Receipt of Initial Vendor Data (for Invoice Claim)-9.029-May-202619-Jun-202621
PK002CV450CWA02 - Crossdock and Filling Structure: Receipt of Initial Vendor Data (for Invoice Claim)0.029-May-202607-Aug-202670
PK002CV530CWA02 - Crossdock and Filling Structure Receipt of Final design from Design Contractor to supplier0.029-May-202607-Aug-202670
PK002CV790CWA02 - Retain Room: Receipt of Initial Vendor Data (for Invoice Claim)-8.729-May-202624-Jul-202656
PK005CV150CWA05 - Operator Shelter (RACK SHACK) (Modular): Receipt of Initial Vendor Data (for Invoice Claim)-5.029-May-202624-Jul-202656
PK005ME450CWA05 - Truck / Rail Scales: Receipt of Initial Vendor Data (for Invoice Claim)-62.029-May-202623-Jun-202625
PK006ME170CWA06 - Instrument Air Generation Package: Mfg. & Supply-21.029-May-202604-May-2027340
PK007EL570CWA07 - AC UPS & DC Battery Charger Package: Mfg. & Supply (combined with PDC)-2.029-May-202607-Apr-2027313
PK007ME250CWA07 - Steam Generation Boiler Package: Receipt of Initial Vendor Data (for Invoice Claim)0.029-May-202625-Jun-202627
PK007ME320CWA07 - Hot Water Heater : TBE / CBE / Final Negotiation0.029-May-202605-Jun-20267
PK004ME570CWA04 - Blender Mixers & Shear Mixers Pumps: Mfg. & Supply-41.005-Jun-202601-Feb-2027241
PK007ME330CWA07 - Hot Water Heater : CBE Client Approval0.008-Jun-202609-Jun-20261
PC13900Issue of Pile location Plan (by Contractor) after receipt of Piling drawing0.009-Jun-202622-Jun-202613
PK007ME340CWA07 - Hot Water Heater : PO Issue0.010-Jun-202612-Jun-20262
PK000IC160CWA00 - Safety Instrumented System: Vendor Drawings Review & Approval-11.012-Jun-202625-Jun-202613
EK000IC1380CWA00 - RFQ - Telecom System: IFP-106.015-Jun-202619-Jun-20264
PK007ME350CWA07 - Hot Water Heater: Receipt of Initial Vendor Data (for Invoice Claim)0.015-Jun-202614-Aug-202660
PK000IC2250CWA00 - Level switches: Mfg. & Supply-4.016-Jun-202610-Feb-2027239
PK001IC900CWA01/02/04/05/07 - Telecom System: CBE Client Approval-113.022-Jun-202626-Jun-20264
PK002CV270CWA02 - Control Room (Modular): Mfg. & Supply-9.022-Jun-202626-Feb-2027249
PC13890Issue of Pile Cap design (by Contractor)0.023-Jun-202606-Jul-202613
PK005ME470CWA05 - Truck / Rail Scales: Mfg. & Supply-65.024-Jun-202619-Jan-2027209
PK001ME310CWA01/05 - Loading / Unloading Arms: Mfg. & Supply-13.025-Jun-202623-Nov-2026151
PK000IC170CWA00 - Safety Instrumented System: Mfg. & Supply-11.026-Jun-202607-Dec-2026164
PK007ME270CWA07 - Steam Generation Boiler Package: Mfg. & Supply0.026-Jun-202622-Jan-2027210
PK001IC560CWA01/02/04/05/07 - Telecom System: PO Issue-113.029-Jun-202602-Jul-20263
PK004IC180CWA04 - GC Analyzer and Analyzer Shelter: CBE Client Approval-8.029-Jun-202602-Jul-20263
PK001IC580CWA01/02/04/05/07 - Telecom System: Mfg. & Supply-115.003-Jul-202614-May-2027315
PK001IC990CWA01/02/04/05/07 - Telecom System: Receipt of Initial Vendor Data (for Invoice Claim)-110.003-Jul-202625-Sep-202684
PK004IC190CWA04 - GC Analyzer and Analyzer Shelter: PO-8.003-Jul-202610-Jul-20267
PK004IC220CWA04 - GC Analyzer and Analyzer Shelter: Receipt of Initial Vendor Data (for Invoice Claim)-8.013-Jul-202604-Sep-202653
EK005CV150CWA05 - Civil Design Calculation (Operator Shelter, Railway & Truck Loading Canopy Foundation): IFR0.027-Jul-202607-Aug-202611
PK002CV170CWA02 - Laboratory (Modular): Mfg. & Supply-4.027-Jul-202623-Apr-2027270
PK002CV800CWA02 - Retain Room: Vendor Drawings Review & Approval-8.727-Jul-202607-Aug-202611
PK005CV170CWA05 - Operator Shelter (RACK SHACK) (Modular): Mfg. & Supply-5.027-Jul-202605-Mar-2027221
EK005CV350CWA05 - Foundation GA & Details (Railway Platform/Truck Loading/Operator Shelter): IFR0.010-Aug-202615-Sep-202636
PK002CV470CWA02 - Crossdock and Filling Structure: Mfg. & Supply (Metallic Building - Suppl , Inst)0.010-Aug-202601-Dec-2026113
PK002CV810CWA02 - Retain Room: Mfg. & Supply-8.710-Aug-202602-Apr-2027235
PK007ME370CWA07 - Hot Water Heater : Vendor Drawings Review & Approval0.017-Aug-202631-Aug-202614
PK004ME160CWA04 - Solids Handling System: Mfg. & Supply-35.021-Aug-202604-Mar-2027195
PK007ME360CWA07 - Hot Water Heater : Mfg. & Supply0.001-Sep-202622-Jan-2027143
PK004IC240CWA04 - GC Analyzer and Analyzer Shelter: Mfg. & Supply-9.007-Sep-202630-Apr-2027235
EK005CV390CWA05 - Foundation GA & Details (Railway Platform/Truck Loading/Operator Shelter): Client Review & Approval0.016-Sep-202624-Sep-20268
EK005CV410CWA05 - Foundation GA & Details (Railway Platform/Truck Loading/Operator Shelter): IFC (Priority)0.025-Sep-202616-Oct-202621
EK000KM160Detailed Engineering Complete0.016-Oct-202616-Oct-20260
PK001ME330CWA01/05 - Loading / Unloading Arms: Shipping & Delivery to Site-19.024-Nov-202624-Jan-202761
PK002CV490CWA02 - Crossdock and Filling Structure: Shipping & Delivery to Site (Metallic Building - Suppl , Inst)0.002-Dec-202631-Dec-202629
PK000IC190CWA00 - Safety Instrumented System: Shipping & Delivery to Site-16.008-Dec-202617-Dec-20269
PK000IC2320CWA00 - Safety Instrumented System: ROS-16.017-Dec-202617-Dec-20260
PK002CV910CWA02 - Crossdock and Filling Structure: ROS (Metallic Building - Suppl , Inst)0.031-Dec-202631-Dec-20260
PK005ME490CWA05 - Truck / Rail Scales: Shipping & Delivery to Site-91.020-Jan-202714-Mar-202753
PK001ME440CWA01/05 - Loading / Unloading Arms: ROS-19.024-Jan-202724-Jan-20270
PK004ME590CWA04 - Blender Mixers & Shear Mixers Pumps: Shipping & Delivery to Site-58.002-Feb-202711-Feb-20279
PK000IC2260CWA00 - Level switches: Vendor Drawings Review & Approval-4.011-Feb-202724-Feb-202713
PK004ME910CWA04 - Blender Mixers & Shear Mixers Pumps: ROS-42.011-Feb-202711-Feb-20270
PK004ME940CWA04 - Resin Blender: ROS-58.011-Feb-202711-Feb-20270
PK000IC2270CWA00 - Level switches: Shipping & Delivery to Site-6.025-Feb-202707-Mar-202710
PK002CV290CWA02 - Control Room (Modular): Shipping & Delivery to Site-11.027-Feb-202709-Mar-202710
PK004ME170CWA04 - Solids Handling System: Final Vendor Data Receipt-34.005-Mar-202719-Mar-202714
PK005CV190CWA05 - Operator Shelter (RACK SHACK) (Modular): Shipping & Delivery to Site-6.006-Mar-202716-Mar-202710
PK000IC2350CWA00 - Level switches: ROS-6.007-Mar-202707-Mar-20270
PK002CV920CWA02 - Control Room (Modular): ROS-11.009-Mar-202709-Mar-20270
PK005ME510CWA05 - Truck / Rail Scales: ROS-91.014-Mar-202714-Mar-20270
PK005CV430CWA05 - Operator Shelter (RACK SHACK) (Modular): ROS-6.016-Mar-202716-Mar-20270
PK004ME180CWA04 - Solids Handling System: Shipping & Delivery to Site-47.020-Mar-202712-Apr-202723
PK002CV820CWA02 - Retain Room: Shipping & Delivery to Site-8.705-Apr-202713-Apr-20278
PK007EL590CWA07 - AC UPS & DC Battery Charger Package: Shipping & Delivery to Site (combined with PDC)-2.008-Apr-202717-Apr-20279
PK004ME920CWA04 - Solids Handling System: ROS-47.012-Apr-202712-Apr-20270
PK002CV940CWA02 - Retain Room: ROS-9.014-Apr-202714-Apr-20270
PK007EL690CWA07 - AC UPS & DC Battery Charger Package: ROS (combined with PDC)-2.017-Apr-202717-Apr-20270
PK002CV190CWA02 - Laboratory (Modular): Shipping & Delivery to Site-4.024-Apr-202704-May-202710
PK004IC260CWA04 - GC Analyzer and Analyzer Shelter: Shipping & Delivery to Site-11.001-May-202711-May-202710
PK002CV930CWA02 - Laboratory (Modular): ROS-4.004-May-202704-May-20270
PK006ME190CWA06 - Instrument Air Generation Package: Shipping & Delivery to Site-29.005-May-202714-May-20279
PK004IC270CWA04 - GC Analyzer and Analyzer Shelter: ROS-11.011-May-202711-May-20270
PK006ME500CWA06 - Instrument Air Generation Package: ROS-29.014-May-202714-May-20270
PK001IC590CWA01/02/04/05/07 - Telecom System: Shipping & Delivery to Site-160.015-May-202724-May-20279
PK001IC595CWA01/02/04/05/07 - Telecom System: ROS-160.024-May-202724-May-20270

Activities in Date Window

Click a status card above (Not Started, In Progress, or Completed) to filter activities, or use the date range form above to filter by date window.

Resource & Work Summary

Download CSV
201,879.80
Planned Work (h)
92,356.95
Actual Work (h)
109,522.85
Remaining (h)
ResourceTypePlanned Work (h)Actual Work (h)Assignments
Contractor ResourcesWORK.00.000
EngineeringWORK.00.000
Contractor Global ResourcesWORK.00.000
Safety EngineeringWORK4,140.002,945.8682
Enterprise Project Code StructuresWORK.00.000
ProcessWORK28,155.6618,064.37124
CivilWORK25,583.004,076.91397
ElectricalWORK16,713.349,126.78332
Instrument and ControlsWORK21,400.0011,788.78392
PipingWORK32,123.8010,755.18111
MechanicalWORK20,926.0011,593.57218
Project ManagementWORK6,515.003,428.954
Project EngineeringWORK.00.002
Engineering Management & SupervisionWORK.00.001
Quality Management & InspectionWORK6,515.003,428.952
Project ControlsWORK6,515.003,428.955
IM / Document ManagementWORK6,515.003,428.951
Administration / SecretarialWORK6,515.003,428.951
Procurement Management & SupportWORK20,263.006,860.75615
ContractorWORK.00.000
Engineering RolesWORK.00.000

Activity Code Usage

Download CSV
Exx.Activity type
PROJECT 2273 unassigned
Value ↕ Count ↕ Distribution
SUB 53
1.9%
PAR 188
6.8%
DTS 5
0.2%
MFG 5
0.2%
RFQ 60
2.2%
PO 40
1.4%
TBE 0
0.0%
MTO 0
0.0%
MR 0
0.0%
CPP 141
5.1%
(Unassigned) 2273
82.2%
Exx.Phase
PROJECT 2028 unassigned
Value ↕ Count ↕ Distribution
00.PML 14
0.5%
05.CON 0
0.0%
04.PRO 693
25.1%
03.DED 30
1.1%
01.FED 0
0.0%
02.BRG 0
0.0%
(Unassigned) 2028
73.3%
Exx.Discipline
PROJECT 349 unassigned
Value ↕ Count ↕ Distribution
CML 0
0.0%
PML 6
0.2%
EML 8
0.3%
PR 150
5.4%
CV 532
19.2%
EL 394
14.2%
IN 550
19.9%
ME 486
17.6%
PI 161
5.8%
GE 0
0.0%
KML 6
0.2%
PU 0
0.0%
SE 123
4.4%
DI 0
0.0%
ES 0
0.0%
(Unassigned) 349
12.6%

WBS Map

Download CSV
WBS Code Name Activities
▾ DEMO-L3-EPC-1 DEMO-L3-EPC-1
2765
▾ DEMO-L3-EPC-1.1 DEMO-L3-EPC-1.1
37
DEMO-L3-EPC-1.1.1 ENGINEERING MILESTONES
24
DEMO-L3-EPC-1.1.2 PROCUREMENT MILESTONES
7
DEMO-L3-EPC-1.1.4 KEY MILESTONES
6
▾ DEMO-L3-EPC-1.2 DEMO-L3-EPC-1.2
58
▾ DEMO-L3-EPC-1.2.7 DEMO-L3-EPC-1.2.7
58
▾ DEMO-L3-EPC-1.2.7.3 DEMO-L3-EPC-1.2.7.3
58
DEMO-L3-EPC-1.2.7.3.1 CWA-01
4
DEMO-L3-EPC-1.2.7.3.10 CWA-00
18
DEMO-L3-EPC-1.2.7.3.2 CWA-03
1
DEMO-L3-EPC-1.2.7.3.3 CWA-04
8
DEMO-L3-EPC-1.2.7.3.4 CWA-02
10
DEMO-L3-EPC-1.2.7.3.5 CWA-05
4
DEMO-L3-EPC-1.2.7.3.6 CWA-06
2
DEMO-L3-EPC-1.2.7.3.7 CWA-07
8
DEMO-L3-EPC-1.2.7.3.9 CWA-09
3
▾ DEMO-L3-EPC-1.3 DEMO-L3-EPC-1.3
21
DEMO-L3-EPC-1.3.4 PROJECT MANAGEMENT & PROJECT CONTROLS
17
DEMO-L3-EPC-1.3.5 ENGINEERING MANAGEMENT
4
▾ DEMO-L3-EPC-1.4 DEMO-L3-EPC-1.4
768
DEMO-L3-EPC-1.4.1 GENERAL AREA TELECOM
11
▾ DEMO-L3-EPC-1.4.10 DEMO-L3-EPC-1.4.10
19
▾ DEMO-L3-EPC-1.4.10.1 DEMO-L3-EPC-1.4.10.1
11
DEMO-L3-EPC-1.4.10.1.22 PWP MV401 - Forklifts
11
▾ DEMO-L3-EPC-1.4.10.2 DEMO-L3-EPC-1.4.10.2
8
DEMO-L3-EPC-1.4.10.2.1 PARs - P81, P82, P83
8
▾ DEMO-L3-EPC-1.4.11 DEMO-L3-EPC-1.4.11
51
▾ DEMO-L3-EPC-1.4.11.1 DEMO-L3-EPC-1.4.11.1
43
DEMO-L3-EPC-1.4.11.1.1 PWP ML405 - Static Mixers
11
DEMO-L3-EPC-1.4.11.1.12 PWP ML401 - Tank Mixers (Side Entry)
11
DEMO-L3-EPC-1.4.11.1.23 PWP MF201 - Shop Fabricated Storage Tanks
11
DEMO-L3-EPC-1.4.11.1.24 PWP MF301 - Field Fabricated Storage Tanks (not in Contractor scope)
10
▾ DEMO-L3-EPC-1.4.11.4 DEMO-L3-EPC-1.4.11.4
8
DEMO-L3-EPC-1.4.11.4.1 PARs - P91, P92, P93
8
▾ DEMO-L3-EPC-1.4.12 DEMO-L3-EPC-1.4.12
327
▾ DEMO-L3-EPC-1.4.12.1 DEMO-L3-EPC-1.4.12.1
44
DEMO-L3-EPC-1.4.12.1.1 PWP SE002 Fire Protection Equipment
11
DEMO-L3-EPC-1.4.12.1.2 Fire Deluge system
11
DEMO-L3-EPC-1.4.12.1.4 PWP SE001 Safety Equipment
11
DEMO-L3-EPC-1.4.12.1.6 PWP SE003 Foam System Package
11
▾ DEMO-L3-EPC-1.4.12.13 DEMO-L3-EPC-1.4.12.13
44
DEMO-L3-EPC-1.4.12.13.1 PWP PS003 - Piping Special Supports
11
DEMO-L3-EPC-1.4.12.13.2 PWP PS002 - Piping Bulk Items(Not in scope)
11
DEMO-L3-EPC-1.4.12.13.3 U/g Piping - HDPE items (Not in scope)
11
DEMO-L3-EPC-1.4.12.13.5 Piping Specialty Items PWPs (PS004, PS005, PS006, PS007, PS008, PS009) (Back flw, Steam trap etc..,)
11
▾ DEMO-L3-EPC-1.4.12.2 DEMO-L3-EPC-1.4.12.2
132
DEMO-L3-EPC-1.4.12.2.1 PWP IC006 Corolis Flow Meter
11
DEMO-L3-EPC-1.4.12.2.10 PWP Level Switches
11
DEMO-L3-EPC-1.4.12.2.11 PWP IC003 Safety Instrumented System
11
DEMO-L3-EPC-1.4.12.2.12 PWP IC011 Radar Type Level Transmitter
11
DEMO-L3-EPC-1.4.12.2.2 PWP IC008 Level Gauges
11
DEMO-L3-EPC-1.4.12.2.3 PWP IC0013 Temperature Gauges
11
DEMO-L3-EPC-1.4.12.2.4 PWP IC007 Electronic Transmitter
11
DEMO-L3-EPC-1.4.12.2.5 PWP IC009 Orifice Flow Meter
11
DEMO-L3-EPC-1.4.12.2.6 PWP IC0010 Pressure Gauges
11
DEMO-L3-EPC-1.4.12.2.7 PWP IC0012 Relief Valves & Rupture Disks
11
DEMO-L3-EPC-1.4.12.2.8 PWP IC004 Actuated On/Off Valves
11
DEMO-L3-EPC-1.4.12.2.9 PWP IC005 Control Valves & Pressure Regulators
11
▾ DEMO-L3-EPC-1.4.12.4 DEMO-L3-EPC-1.4.12.4
96
▾ DEMO-L3-EPC-1.4.12.4.1 DEMO-L3-EPC-1.4.12.4.1
33
DEMO-L3-EPC-1.4.12.4.1.19 PWP MJ303 - API 610 Pumps
11
DEMO-L3-EPC-1.4.12.4.1.20 PWP MV101 - Drum/Tote Filling Equipment
11
DEMO-L3-EPC-1.4.12.4.1.6 PWP ML501 - Sample Lab Transfer Package
11
▾ DEMO-L3-EPC-1.4.12.4.2 DEMO-L3-EPC-1.4.12.4.2
40
DEMO-L3-EPC-1.4.12.4.2.1 PWP A0001 - Prefabricated Buildings - Crossdock & Filling Structure (Architectural design)
8
DEMO-L3-EPC-1.4.12.4.2.2 PWP A0002 - Prefabricated Buildings - Laboratory
11
DEMO-L3-EPC-1.4.12.4.2.3 PWP A0003 - Prefabricated Buildings - Control Room
11
DEMO-L3-EPC-1.4.12.4.2.5 PWP A0001 - Prefabricated Buildings - Crossdock & Filling Structure -Metallic building (Supply, Ins)
10
▾ DEMO-L3-EPC-1.4.12.4.3 DEMO-L3-EPC-1.4.12.4.3
15
▾ DEMO-L3-EPC-1.4.12.4.3.12 PWP IC001 - Distributed Control System
15
DEMO-L3-EPC-1.4.12.4.3.12.1 Hardware
3
DEMO-L3-EPC-1.4.12.4.3.12.2 Software
4
▾ DEMO-L3-EPC-1.4.12.4.4 DEMO-L3-EPC-1.4.12.4.4
8
DEMO-L3-EPC-1.4.12.4.4.1 PARs - P21, P22
8
▾ DEMO-L3-EPC-1.4.12.5 DEMO-L3-EPC-1.4.12.5
11
DEMO-L3-EPC-1.4.12.5.1 PWP A0005 - Retain Room
11
▾ DEMO-L3-EPC-1.4.3 DEMO-L3-EPC-1.4.3
33
▾ DEMO-L3-EPC-1.4.3.1 DEMO-L3-EPC-1.4.3.1
33
DEMO-L3-EPC-1.4.3.1.10 PWP MV211 - Loading / Unloading Arms
11
DEMO-L3-EPC-1.4.3.1.18 PWP MJ301 - Centrifugal-Sealless Pumps
11
DEMO-L3-EPC-1.4.3.1.7 PWP ML403 - Filters
11
▾ DEMO-L3-EPC-1.4.5 DEMO-L3-EPC-1.4.5
29
▾ DEMO-L3-EPC-1.4.5.1 DEMO-L3-EPC-1.4.5.1
21
DEMO-L3-EPC-1.4.5.1.12 PWP ML401 - Tank Mixers (Side Entry)
11
DEMO-L3-EPC-1.4.5.1.24 PWP MF301 - Field Fabricated Storage Tanks (Subcontract)
10
▾ DEMO-L3-EPC-1.4.5.2 DEMO-L3-EPC-1.4.5.2
8
DEMO-L3-EPC-1.4.5.2.3 PARs - P31, P32, P33, P34
8
▾ DEMO-L3-EPC-1.4.6 DEMO-L3-EPC-1.4.6
95
▾ DEMO-L3-EPC-1.4.6.1 DEMO-L3-EPC-1.4.6.1
65
DEMO-L3-EPC-1.4.6.1.1 PWP MJ302 - PD Pumps
11
DEMO-L3-EPC-1.4.6.1.12 PWP MD401 - Drums/Vessels
11
DEMO-L3-EPC-1.4.6.1.13 PWP MD101 - Resin Blender
11
DEMO-L3-EPC-1.4.6.1.2 PWP MJ306 - Blender Mixers & Shear Mixers Pumps
11
DEMO-L3-EPC-1.4.6.1.21 PWP ML402 - Antioxidant Tank Mixer (Top entry)
11
DEMO-L3-EPC-1.4.6.1.3 PWP MV201 - Solids Handling System
10
▾ DEMO-L3-EPC-1.4.6.13 DEMO-L3-EPC-1.4.6.13
11
DEMO-L3-EPC-1.4.6.13.6 PWP PS001 - Pigging Manifold Package
11
▾ DEMO-L3-EPC-1.4.6.2 DEMO-L3-EPC-1.4.6.2
8
DEMO-L3-EPC-1.4.6.2.1 PARs - P41, P42, P43, P44, P45, P46, P47
8
▾ DEMO-L3-EPC-1.4.6.5 DEMO-L3-EPC-1.4.6.5
11
DEMO-L3-EPC-1.4.6.5.1 PWP IC002 - GC Analyzer and Analyzer Shelter
11
▾ DEMO-L3-EPC-1.4.7 DEMO-L3-EPC-1.4.7
52
▾ DEMO-L3-EPC-1.4.7.1 DEMO-L3-EPC-1.4.7.1
11
DEMO-L3-EPC-1.4.7.1.14 PWP MV501 - Truck / Rail Scales
11
▾ DEMO-L3-EPC-1.4.7.2 DEMO-L3-EPC-1.4.7.2
33
DEMO-L3-EPC-1.4.7.2.1 PWP CX002 - Prefabricated Buildings - Truck Loading Canopy Platform
11
DEMO-L3-EPC-1.4.7.2.12 PWP A0006 - Prefabricated Buildings - Operator Shelter ( RACK SACK) (Modular)
11
DEMO-L3-EPC-1.4.7.2.2 PWP CX001 - Prefabricated Buildings - Railway Loading Canopy & Platform
11
▾ DEMO-L3-EPC-1.4.7.3 DEMO-L3-EPC-1.4.7.3
8
DEMO-L3-EPC-1.4.7.3.1 PAR - P51
8
▾ DEMO-L3-EPC-1.4.8 DEMO-L3-EPC-1.4.8
54
▾ DEMO-L3-EPC-1.4.8.1 DEMO-L3-EPC-1.4.8.1
43
DEMO-L3-EPC-1.4.8.1.15 PWP ML301 - Instrument Air Generation Package
11
DEMO-L3-EPC-1.4.8.1.16 PWP ML404 - Carbon Beds
10
DEMO-L3-EPC-1.4.8.1.3 PWP MC121 - Double Pipe Heat Exchangers
10
DEMO-L3-EPC-1.4.8.1.4 PWP MU401 - Steam Generation Boiler Package
12
▾ DEMO-L3-EPC-1.4.8.2 DEMO-L3-EPC-1.4.8.2
11
DEMO-L3-EPC-1.4.8.2.12 PWP CX003 - Prefabricated Buildings - VNB Canopy / Shelter
11
▾ DEMO-L3-EPC-1.4.9 DEMO-L3-EPC-1.4.9
97
▾ DEMO-L3-EPC-1.4.9.1 DEMO-L3-EPC-1.4.9.1
34
DEMO-L3-EPC-1.4.9.1.12 PWP ML302 - Hot Water Module Package (not in scope)
10
DEMO-L3-EPC-1.4.9.1.2 Hot water Heater
11
DEMO-L3-EPC-1.4.9.1.4 PWP ML303 - Chiller Package (New Cooling System)
13
▾ DEMO-L3-EPC-1.4.9.12 DEMO-L3-EPC-1.4.9.12
55
DEMO-L3-EPC-1.4.9.12.1 PWP E0005 - MV Outdoor Switchgear 34.5kV
11
DEMO-L3-EPC-1.4.9.12.13 PWP E0003 - Non-Segregated LV Bus Duct
11
DEMO-L3-EPC-1.4.9.12.2 PWP E0001 - PDC Substation / LV MCC / LV Switchgear
11
DEMO-L3-EPC-1.4.9.12.3 PWP E0004 - AC UPS & DC Battery Charger Package
11
DEMO-L3-EPC-1.4.9.12.6 PWP E0002 - LV Transformer 34.5kV/0.48kV
11
▾ DEMO-L3-EPC-1.4.9.2 DEMO-L3-EPC-1.4.9.2
8
DEMO-L3-EPC-1.4.9.2.1 PARs - P71, P72
8
▾ DEMO-L3-EPC-1.5 DEMO-L3-EPC-1.5
22
DEMO-L3-EPC-1.5.2 Electrcial Heat Tracing
11
▾ DEMO-L3-EPC-1.5.4 DEMO-L3-EPC-1.5.4
11
DEMO-L3-EPC-1.5.4.1 Contractor Scope
11
▾ DEMO-L3-EPC-1.7 DEMO-L3-EPC-1.7
18
▾ DEMO-L3-EPC-1.7.7 DEMO-L3-EPC-1.7.7
18
▾ DEMO-L3-EPC-1.7.7.1 DEMO-L3-EPC-1.7.7.1
4
▾ DEMO-L3-EPC-1.7.7.1.1 DEMO-L3-EPC-1.7.7.1.1
4
DEMO-L3-EPC-1.7.7.1.1.1 General Activities
4
▾ DEMO-L3-EPC-1.7.7.2 DEMO-L3-EPC-1.7.7.2
4
▾ DEMO-L3-EPC-1.7.7.2.1 DEMO-L3-EPC-1.7.7.2.1
4
DEMO-L3-EPC-1.7.7.2.1.1 General Activities
4
▾ DEMO-L3-EPC-1.7.7.3 DEMO-L3-EPC-1.7.7.3
1
▾ DEMO-L3-EPC-1.7.7.3.3 DEMO-L3-EPC-1.7.7.3.3
1
DEMO-L3-EPC-1.7.7.3.3.1 General Activities
1
▾ DEMO-L3-EPC-1.7.7.4 DEMO-L3-EPC-1.7.7.4
3
▾ DEMO-L3-EPC-1.7.7.4.1 DEMO-L3-EPC-1.7.7.4.1
3
DEMO-L3-EPC-1.7.7.4.1.1 General Activities
3
▾ DEMO-L3-EPC-1.7.7.5 DEMO-L3-EPC-1.7.7.5
2
▾ DEMO-L3-EPC-1.7.7.5.2 DEMO-L3-EPC-1.7.7.5.2
2
DEMO-L3-EPC-1.7.7.5.2.1 General Activities
2
▾ DEMO-L3-EPC-1.7.7.6 DEMO-L3-EPC-1.7.7.6
2
▾ DEMO-L3-EPC-1.7.7.6.1 DEMO-L3-EPC-1.7.7.6.1
2
DEMO-L3-EPC-1.7.7.6.1.1 General Activities
2
▾ DEMO-L3-EPC-1.7.7.7 DEMO-L3-EPC-1.7.7.7
2
▾ DEMO-L3-EPC-1.7.7.7.1 DEMO-L3-EPC-1.7.7.7.1
2
DEMO-L3-EPC-1.7.7.7.1.1 General Activities
2
▾ DEMO-L3-EPC-1.8 DEMO-L3-EPC-1.8
1841
▾ DEMO-L3-EPC-1.8.10 DEMO-L3-EPC-1.8.10
70
▾ DEMO-L3-EPC-1.8.10.1 DEMO-L3-EPC-1.8.10.1
6
▾ DEMO-L3-EPC-1.8.10.1.3 DEMO-L3-EPC-1.8.10.1.3
6
DEMO-L3-EPC-1.8.10.1.3.1 P&IDs
6
▾ DEMO-L3-EPC-1.8.10.2 DEMO-L3-EPC-1.8.10.2
1
▾ DEMO-L3-EPC-1.8.10.2.2 DEMO-L3-EPC-1.8.10.2.2
1
DEMO-L3-EPC-1.8.10.2.2.1 Piping Isometrics
1
▾ DEMO-L3-EPC-1.8.10.4 DEMO-L3-EPC-1.8.10.4
6
▾ DEMO-L3-EPC-1.8.10.4.3 DEMO-L3-EPC-1.8.10.4.3
6
DEMO-L3-EPC-1.8.10.4.3.1 Foundation GA
3
DEMO-L3-EPC-1.8.10.4.3.2 Civil Design Calculation
3
▾ DEMO-L3-EPC-1.8.10.5 DEMO-L3-EPC-1.8.10.5
21
▾ DEMO-L3-EPC-1.8.10.5.1 DEMO-L3-EPC-1.8.10.5.1
4
DEMO-L3-EPC-1.8.10.5.1.4 Cable Tray Layout
4
▾ DEMO-L3-EPC-1.8.10.5.10 DEMO-L3-EPC-1.8.10.5.10
4
DEMO-L3-EPC-1.8.10.5.10.2 Grounding Layout
4
▾ DEMO-L3-EPC-1.8.10.5.2 DEMO-L3-EPC-1.8.10.5.2
5
DEMO-L3-EPC-1.8.10.5.2.1 Lighting & Small Power Layout
4
DEMO-L3-EPC-1.8.10.5.2.2 Lighting & Small Power Wiring Diagram
1
▾ DEMO-L3-EPC-1.8.10.5.3 DEMO-L3-EPC-1.8.10.5.3
8
DEMO-L3-EPC-1.8.10.5.3.4 Power Plan Layout
4
DEMO-L3-EPC-1.8.10.5.3.5 Power Plan Schedule
4
▾ DEMO-L3-EPC-1.8.10.6 DEMO-L3-EPC-1.8.10.6
36
▾ DEMO-L3-EPC-1.8.10.6.1 DEMO-L3-EPC-1.8.10.6.1
22
DEMO-L3-EPC-1.8.10.6.1.1 Instrumentation Hook Up Diagrams - Truck / Isotainer
4
DEMO-L3-EPC-1.8.10.6.1.2 Instrumentation Installation Diagrams - Truck / Isotainer
4
DEMO-L3-EPC-1.8.10.6.1.3 Instrument Location and JB Location Layout - Truck / Isotainer
4
DEMO-L3-EPC-1.8.10.6.1.4 Instrument Cable Routing Drawing - Truck / Isotainer
4
DEMO-L3-EPC-1.8.10.6.1.5 Instrument JB Schedule - Truck / Isotainer
4
DEMO-L3-EPC-1.8.10.6.1.6 Bulk MTO - Truck / Isotainer
2
▾ DEMO-L3-EPC-1.8.10.6.2 DEMO-L3-EPC-1.8.10.6.2
2
DEMO-L3-EPC-1.8.10.6.2.5 MTO - Truck / Isotainer
2
▾ DEMO-L3-EPC-1.8.10.6.3 DEMO-L3-EPC-1.8.10.6.3
4
DEMO-L3-EPC-1.8.10.6.3.5 Access Control Systems Layout
4
▾ DEMO-L3-EPC-1.8.10.6.4 DEMO-L3-EPC-1.8.10.6.4
8
DEMO-L3-EPC-1.8.10.6.4.1 CCTV Layout - Truck / Isotainer
4
DEMO-L3-EPC-1.8.10.6.4.6 PAGA Layout - Truck / Isotainer
4
▾ DEMO-L3-EPC-1.8.11 DEMO-L3-EPC-1.8.11
215
▾ DEMO-L3-EPC-1.8.11.2 DEMO-L3-EPC-1.8.11.2
2
▾ DEMO-L3-EPC-1.8.11.2.9 DEMO-L3-EPC-1.8.11.2.9
2
DEMO-L3-EPC-1.8.11.2.9.1 Piping Isometrics
2
▾ DEMO-L3-EPC-1.8.11.3 DEMO-L3-EPC-1.8.11.3
50
▾ DEMO-L3-EPC-1.8.11.3.1 DEMO-L3-EPC-1.8.11.3.1
50
DEMO-L3-EPC-1.8.11.3.1.1 Mechanical Datasheets - Sample Lab Transfer Package
4
DEMO-L3-EPC-1.8.11.3.1.10 Mechanical Datasheets - API 610 Pumps
2
DEMO-L3-EPC-1.8.11.3.1.11 Air Flow Diagram
2
DEMO-L3-EPC-1.8.11.3.1.12 Duct Layouts
4
DEMO-L3-EPC-1.8.11.3.1.13 General Activities
1
DEMO-L3-EPC-1.8.11.3.1.14 Technical Requisitions - API 610 Pumps
4
DEMO-L3-EPC-1.8.11.3.1.15 Vendor Drawing Review & Approval (VDR)
4
DEMO-L3-EPC-1.8.11.3.1.16 Technical Requisitions - Sample Lab Transfer Package
4
DEMO-L3-EPC-1.8.11.3.1.19 Mechanical Datasheets - Carbon Canisters
1
DEMO-L3-EPC-1.8.11.3.1.2 Technical Requisitions - Drum / Tote Filling Equipment
4
DEMO-L3-EPC-1.8.11.3.1.3 Mechanical Datasheets - Drum / Tote Filling Equipment
4
DEMO-L3-EPC-1.8.11.3.1.4 HVAC Datasheets
3
DEMO-L3-EPC-1.8.11.3.1.5 HVAC Electric SLD
4
DEMO-L3-EPC-1.8.11.3.1.6 MTO
1
DEMO-L3-EPC-1.8.11.3.1.7 Technical Bid Evaluation
4
DEMO-L3-EPC-1.8.11.3.1.9 HVAC Control & Logic Schematic Sequence of Operation
4
▾ DEMO-L3-EPC-1.8.11.4 DEMO-L3-EPC-1.8.11.4
70
▾ DEMO-L3-EPC-1.8.11.4.1 DEMO-L3-EPC-1.8.11.4.1
24
DEMO-L3-EPC-1.8.11.4.1.1 Foundation GA & Details - Crossdock & Filling Structure
3
DEMO-L3-EPC-1.8.11.4.1.2 Foundation GA & Details - Control Room - Module
3
DEMO-L3-EPC-1.8.11.4.1.4 Foundation GA & Details - Laboratory - Module
3
DEMO-L3-EPC-1.8.11.4.1.5 Foundation GA & Details of PAR P21
3
DEMO-L3-EPC-1.8.11.4.1.6 Foundation GA & Details of PAR P22
3
DEMO-L3-EPC-1.8.11.4.1.7 Civil Design Calculation
3
DEMO-L3-EPC-1.8.11.4.1.8 Foundation Design Calculation - PARs P21, P22
3
DEMO-L3-EPC-1.8.11.4.1.9 Foundation GA & Details - Sump (700 gallon)
3
▾ DEMO-L3-EPC-1.8.11.4.2 DEMO-L3-EPC-1.8.11.4.2
3
DEMO-L3-EPC-1.8.11.4.2.1 Flammable Low Flash Storage & Bottle Racks Foundation
3
▾ DEMO-L3-EPC-1.8.11.4.3 DEMO-L3-EPC-1.8.11.4.3
25
DEMO-L3-EPC-1.8.11.4.3.11 Building & Archchitectural/Datasheet/Specification - Control Room
3
DEMO-L3-EPC-1.8.11.4.3.12 Building & Archchitectural/Datasheet/Specification - Retain Room
6
DEMO-L3-EPC-1.8.11.4.3.15 Building & Archchitectural/Datasheet/Specification - Cross Dock and Filling Structure
3
DEMO-L3-EPC-1.8.11.4.3.3 Building & Archchitectural/Datasheet/Specification - Laboratory
3
DEMO-L3-EPC-1.8.11.4.3.4 Technical Bid Evaluation - Subcontracts Drawings Review
4
DEMO-L3-EPC-1.8.11.4.3.5 Subcontracts Drawings Review
6
▾ DEMO-L3-EPC-1.8.11.4.4 DEMO-L3-EPC-1.8.11.4.4
6
DEMO-L3-EPC-1.8.11.4.4.1 Structural GA & Details - P21
3
DEMO-L3-EPC-1.8.11.4.4.2 Structural Design Calculation - P21
3
▾ DEMO-L3-EPC-1.8.11.4.9 DEMO-L3-EPC-1.8.11.4.9
12
DEMO-L3-EPC-1.8.11.4.9.1 Structural GA & Details - P22
3
DEMO-L3-EPC-1.8.11.4.9.2 Structural Design Calculation - P22
3
DEMO-L3-EPC-1.8.11.4.9.3 Structural Design Calculation - P23
3
DEMO-L3-EPC-1.8.11.4.9.4 Structural GA & Details - P23
3
▾ DEMO-L3-EPC-1.8.11.5 DEMO-L3-EPC-1.8.11.5
21
▾ DEMO-L3-EPC-1.8.11.5.1 DEMO-L3-EPC-1.8.11.5.1
4
DEMO-L3-EPC-1.8.11.5.1.1 Cable Tray Layout
4
▾ DEMO-L3-EPC-1.8.11.5.10 DEMO-L3-EPC-1.8.11.5.10
4
DEMO-L3-EPC-1.8.11.5.10.2 Grounding Layout
4
▾ DEMO-L3-EPC-1.8.11.5.2 DEMO-L3-EPC-1.8.11.5.2
8
DEMO-L3-EPC-1.8.11.5.2.1 Power Plan Layout
4
DEMO-L3-EPC-1.8.11.5.2.4 Power Panel Schedule
4
▾ DEMO-L3-EPC-1.8.11.5.3 DEMO-L3-EPC-1.8.11.5.3
5
DEMO-L3-EPC-1.8.11.5.3.1 Lighting & Small Power Layout
4
DEMO-L3-EPC-1.8.11.5.3.2 Lighting & Small Power Wiring Diagram
1
▾ DEMO-L3-EPC-1.8.11.6 DEMO-L3-EPC-1.8.11.6
66
▾ DEMO-L3-EPC-1.8.11.6.1 DEMO-L3-EPC-1.8.11.6.1
20
DEMO-L3-EPC-1.8.11.6.1.1 Instrument Cable Routing Drawing - Control Room
4
DEMO-L3-EPC-1.8.11.6.1.2 Instrumentation Installation Diagrams (Control Room, Filinng & Lab)
4
DEMO-L3-EPC-1.8.11.6.1.3 Instrument Hook Up Diagram (Control Room, Filinng & Lab)
4
DEMO-L3-EPC-1.8.11.6.1.5 Instrument Location and JB Location Layout (Control Room, Filinng & Lab)
4
DEMO-L3-EPC-1.8.11.6.1.6 nstrument Junction Box Wiring(Control Room, Filinng & Lab)
4
DEMO-L3-EPC-1.8.11.6.10 Telecom Equipment Layout - Cross dock
4
▾ DEMO-L3-EPC-1.8.11.6.2 DEMO-L3-EPC-1.8.11.6.2
12
DEMO-L3-EPC-1.8.11.6.2.1 Control Room/Local Equipment Room Layout
4
DEMO-L3-EPC-1.8.11.6.2.2 Control System Architecture
4
DEMO-L3-EPC-1.8.11.6.2.43 RFQ - Distributed Control System
4
DEMO-L3-EPC-1.8.11.6.3 Telecom Equipment Layout - Retain Room
4
▾ DEMO-L3-EPC-1.8.11.6.4 DEMO-L3-EPC-1.8.11.6.4
4
DEMO-L3-EPC-1.8.11.6.4.1 PAGA Layout
4
▾ DEMO-L3-EPC-1.8.11.6.5 DEMO-L3-EPC-1.8.11.6.5
4
DEMO-L3-EPC-1.8.11.6.5.1 CCTV Layout
4
▾ DEMO-L3-EPC-1.8.11.6.6 DEMO-L3-EPC-1.8.11.6.6
6
DEMO-L3-EPC-1.8.11.6.6.1 ACS Layout
4
DEMO-L3-EPC-1.8.11.6.6.3 Telecom MTO
2
DEMO-L3-EPC-1.8.11.6.7 Telecom Equipment Layout - Laboratory
4
DEMO-L3-EPC-1.8.11.6.8 Telecom Equipment Layout - Rack shack
4
▾ DEMO-L3-EPC-1.8.11.6.9 DEMO-L3-EPC-1.8.11.6.9
4
DEMO-L3-EPC-1.8.11.6.9.1 Network Systems Equipment Layout (Control Room / Lab)
4
▾ DEMO-L3-EPC-1.8.11.8 DEMO-L3-EPC-1.8.11.8
6
▾ DEMO-L3-EPC-1.8.11.8.2 DEMO-L3-EPC-1.8.11.8.2
6
DEMO-L3-EPC-1.8.11.8.2.1 P&IDs
6
▾ DEMO-L3-EPC-1.8.12 DEMO-L3-EPC-1.8.12
121
▾ DEMO-L3-EPC-1.8.12.2 DEMO-L3-EPC-1.8.12.2
6
▾ DEMO-L3-EPC-1.8.12.2.1 DEMO-L3-EPC-1.8.12.2.1
6
DEMO-L3-EPC-1.8.12.2.1.1 Unit Plot Plan
4
DEMO-L3-EPC-1.8.12.2.1.2 Piping Isometrics
2
▾ DEMO-L3-EPC-1.8.12.3 DEMO-L3-EPC-1.8.12.3
16
▾ DEMO-L3-EPC-1.8.12.3.1 DEMO-L3-EPC-1.8.12.3.1
8
DEMO-L3-EPC-1.8.12.3.1.1 Mechanical Datasheets
2
DEMO-L3-EPC-1.8.12.3.1.2 Technical Requisitions
4
DEMO-L3-EPC-1.8.12.3.1.4 Technical Bid Evaluation
1
DEMO-L3-EPC-1.8.12.3.1.5 Vendor Drawings Review
1
▾ DEMO-L3-EPC-1.8.12.3.2 DEMO-L3-EPC-1.8.12.3.2
8
DEMO-L3-EPC-1.8.12.3.2.1 Mechanical Datasheets
2
DEMO-L3-EPC-1.8.12.3.2.2 Technical Requisitions
4
DEMO-L3-EPC-1.8.12.3.2.3 Vendor Drawings Review
1
DEMO-L3-EPC-1.8.12.3.2.4 Technical Bid Evaluation
1
▾ DEMO-L3-EPC-1.8.12.4 DEMO-L3-EPC-1.8.12.4
46
▾ DEMO-L3-EPC-1.8.12.4.1 DEMO-L3-EPC-1.8.12.4.1
15
DEMO-L3-EPC-1.8.12.4.1.1 Tank Foundation GAs
3
DEMO-L3-EPC-1.8.12.4.1.2 Foundation GA & Details of PARs P31, P32, P33, P34
3
DEMO-L3-EPC-1.8.12.4.1.3 Foundation Design Calculation - PARs P31, P32, P33, P34
3
DEMO-L3-EPC-1.8.12.4.1.6 Design Calculation
3
DEMO-L3-EPC-1.8.12.4.1.9 Foundation GA & Details - Sump (300 gallon)
3
▾ DEMO-L3-EPC-1.8.12.4.2 DEMO-L3-EPC-1.8.12.4.2
4
DEMO-L3-EPC-1.8.12.4.2.1 Dyke Wall Layout, Details, Elevations & Sections
4
▾ DEMO-L3-EPC-1.8.12.4.4 DEMO-L3-EPC-1.8.12.4.4
3
DEMO-L3-EPC-1.8.12.4.4.1 Misc. Steel Details
3
▾ DEMO-L3-EPC-1.8.12.4.5 DEMO-L3-EPC-1.8.12.4.5
6
DEMO-L3-EPC-1.8.12.4.5.1 Structural GA & Details - PAR P31
3
DEMO-L3-EPC-1.8.12.4.5.2 Structural Design Calculation - PAR P31
3
▾ DEMO-L3-EPC-1.8.12.4.6 DEMO-L3-EPC-1.8.12.4.6
6
DEMO-L3-EPC-1.8.12.4.6.1 Structural GA & Details - PAR P32
3
DEMO-L3-EPC-1.8.12.4.6.2 Structural Design Calculation - PAR P32
3
▾ DEMO-L3-EPC-1.8.12.4.7 DEMO-L3-EPC-1.8.12.4.7
6
DEMO-L3-EPC-1.8.12.4.7.1 Structural GA & Details - PAR P34
3
DEMO-L3-EPC-1.8.12.4.7.2 Structural Design Calculation - PAR P34
3
▾ DEMO-L3-EPC-1.8.12.4.9 DEMO-L3-EPC-1.8.12.4.9
6
DEMO-L3-EPC-1.8.12.4.9.1 Structural GA & Details - PAR P33
3
DEMO-L3-EPC-1.8.12.4.9.2 Structural Design Calculation - PAR P33
3
▾ DEMO-L3-EPC-1.8.12.5 DEMO-L3-EPC-1.8.12.5
21
▾ DEMO-L3-EPC-1.8.12.5.1 DEMO-L3-EPC-1.8.12.5.1
4
DEMO-L3-EPC-1.8.12.5.1.1 Cable Tray Layout
4
▾ DEMO-L3-EPC-1.8.12.5.10 DEMO-L3-EPC-1.8.12.5.10
4
DEMO-L3-EPC-1.8.12.5.10.2 Grounding Layout
4
▾ DEMO-L3-EPC-1.8.12.5.2 DEMO-L3-EPC-1.8.12.5.2
8
DEMO-L3-EPC-1.8.12.5.2.1 Power Panel Schedule
4
DEMO-L3-EPC-1.8.12.5.2.4 Power Plan Layout
4
▾ DEMO-L3-EPC-1.8.12.5.3 DEMO-L3-EPC-1.8.12.5.3
5
DEMO-L3-EPC-1.8.12.5.3.1 Lighting & Small Power Layout
4
DEMO-L3-EPC-1.8.12.5.3.2 Lighting & Small Power Wiring Diagram
1
▾ DEMO-L3-EPC-1.8.12.6 DEMO-L3-EPC-1.8.12.6
22
▾ DEMO-L3-EPC-1.8.12.6.2 DEMO-L3-EPC-1.8.12.6.2
22
DEMO-L3-EPC-1.8.12.6.2.1 Instrumentation Hook Up Diagrams - Tankfarm Large
4
DEMO-L3-EPC-1.8.12.6.2.2 Instrumentation Installation Diagrams - Tankfarm Large
4
DEMO-L3-EPC-1.8.12.6.2.3 Instrument Location and JB Location Layout - Tankfarm Large
4
DEMO-L3-EPC-1.8.12.6.2.4 Instrument Cable Routing Drawing - Tankfarm Large
4
DEMO-L3-EPC-1.8.12.6.2.5 Instrument JB Schedule - Tankfarm Large
4
DEMO-L3-EPC-1.8.12.6.2.6 Bulk MTO - Tankfarm Large
2
▾ DEMO-L3-EPC-1.8.12.7 DEMO-L3-EPC-1.8.12.7
10
▾ DEMO-L3-EPC-1.8.12.7.3 DEMO-L3-EPC-1.8.12.7.3
10
DEMO-L3-EPC-1.8.12.7.3.1 PFDs
4
DEMO-L3-EPC-1.8.12.7.3.2 P&IDs
6
▾ DEMO-L3-EPC-1.8.13 DEMO-L3-EPC-1.8.13
174
▾ DEMO-L3-EPC-1.8.13.2 DEMO-L3-EPC-1.8.13.2
6
▾ DEMO-L3-EPC-1.8.13.2.2 DEMO-L3-EPC-1.8.13.2.2
6
DEMO-L3-EPC-1.8.13.2.2.1 Unit Plot Plan
4
DEMO-L3-EPC-1.8.13.2.2.2 Piping Isometrics
2
▾ DEMO-L3-EPC-1.8.13.3 DEMO-L3-EPC-1.8.13.3
34
▾ DEMO-L3-EPC-1.8.13.3.1 DEMO-L3-EPC-1.8.13.3.1
8
DEMO-L3-EPC-1.8.13.3.1.1 Vendor Drawings Review
1
DEMO-L3-EPC-1.8.13.3.1.2 Mechanical Datasheet - Resin Blenders
2
DEMO-L3-EPC-1.8.13.3.1.3 Technical Requisition - Resin Blenders
4
DEMO-L3-EPC-1.8.13.3.1.4 Technical Bid Evaluation
1
▾ DEMO-L3-EPC-1.8.13.3.2 DEMO-L3-EPC-1.8.13.3.2
24
DEMO-L3-EPC-1.8.13.3.2.1 Mechanical Datasheet - Blender Mixers & Shear Mixer Pumps
2
DEMO-L3-EPC-1.8.13.3.2.2 Technical Requisitions - Blender Mixers & Shear Mixer Pumps
4
DEMO-L3-EPC-1.8.13.3.2.3 Mechanical Datasheet - Antioxidant Tank Mixer (Top Entry)
2
DEMO-L3-EPC-1.8.13.3.2.4 Technical Bid Evaluation
3
DEMO-L3-EPC-1.8.13.3.2.5 Vendor Drawings Review
3
DEMO-L3-EPC-1.8.13.3.2.6 Technical Requisition - Antioxidant Tank Mixer (Top Entry)
4
DEMO-L3-EPC-1.8.13.3.2.7 Technical Requisition - PD Pumps
4
DEMO-L3-EPC-1.8.13.3.2.8 Mechanical Datasheet - PD Pumps
2
▾ DEMO-L3-EPC-1.8.13.3.3 DEMO-L3-EPC-1.8.13.3.3
2
DEMO-L3-EPC-1.8.13.3.3.2 General Activities
2
▾ DEMO-L3-EPC-1.8.13.4 DEMO-L3-EPC-1.8.13.4
69
▾ DEMO-L3-EPC-1.8.13.4.1 DEMO-L3-EPC-1.8.13.4.1
18
DEMO-L3-EPC-1.8.13.4.1.1 Foundation GA & Details of PARs P41, P42, P43, P44, P45, P46, P47
3
DEMO-L3-EPC-1.8.13.4.1.2 Foundation Design Calculation - Blending Canopy
3
DEMO-L3-EPC-1.8.13.4.1.3 Foundation GA & Details - Blending Canopy
3
DEMO-L3-EPC-1.8.13.4.1.4 Foundation GA & Details - Platform Outside the Canopy
3
DEMO-L3-EPC-1.8.13.4.1.5 Foundation GA & Details - Sump (50000 / 300 gallon)
3
DEMO-L3-EPC-1.8.13.4.1.9 Foundation Design Calculation - PARs P41, P42, P43, P44, P45, P46, P47
3
▾ DEMO-L3-EPC-1.8.13.4.2 DEMO-L3-EPC-1.8.13.4.2
6
DEMO-L3-EPC-1.8.13.4.2.1 Structural GA & Details - PAR P41
3
DEMO-L3-EPC-1.8.13.4.2.2 Structural Design Calculation - PAR P41
3
▾ DEMO-L3-EPC-1.8.13.4.3 DEMO-L3-EPC-1.8.13.4.3
9
DEMO-L3-EPC-1.8.13.4.3.1 Structural GA & Details - Blending Canopy
3
DEMO-L3-EPC-1.8.13.4.3.2 Structural Design Calculation - Platform in Blending Canopy
3
DEMO-L3-EPC-1.8.13.4.3.3 Structural GA & Details - Platform in Blending Canopy
3
▾ DEMO-L3-EPC-1.8.13.4.4 DEMO-L3-EPC-1.8.13.4.4
6
DEMO-L3-EPC-1.8.13.4.4.1 Structural GA & Details - PAR P44
3
DEMO-L3-EPC-1.8.13.4.4.2 Structural Design Calculation - PAR P44
3
▾ DEMO-L3-EPC-1.8.13.4.5 DEMO-L3-EPC-1.8.13.4.5
6
DEMO-L3-EPC-1.8.13.4.5.1 Structural GA & Details - PAR P43
3
DEMO-L3-EPC-1.8.13.4.5.2 Structural Design Calculation - PAR P43
3
▾ DEMO-L3-EPC-1.8.13.4.6 DEMO-L3-EPC-1.8.13.4.6
6
DEMO-L3-EPC-1.8.13.4.6.1 Structural GA & Details - PAR P45
3
DEMO-L3-EPC-1.8.13.4.6.2 Structural Design Calculation - PAR P45
3
▾ DEMO-L3-EPC-1.8.13.4.7 DEMO-L3-EPC-1.8.13.4.7
6
DEMO-L3-EPC-1.8.13.4.7.1 Structural GA & Details - PAR P42
3
DEMO-L3-EPC-1.8.13.4.7.2 Structural Design Calculation - PAR P42
3
▾ DEMO-L3-EPC-1.8.13.4.8 DEMO-L3-EPC-1.8.13.4.8
6
DEMO-L3-EPC-1.8.13.4.8.1 Structural GA & Details - PAR P46
3
DEMO-L3-EPC-1.8.13.4.8.2 Structural Design Calculation - PAR P46
3
▾ DEMO-L3-EPC-1.8.13.4.9 DEMO-L3-EPC-1.8.13.4.9
6
DEMO-L3-EPC-1.8.13.4.9.1 Structural GA & Details - PAR P47
3
DEMO-L3-EPC-1.8.13.4.9.2 Structural Design Calculation - PAR P47
3
▾ DEMO-L3-EPC-1.8.13.5 DEMO-L3-EPC-1.8.13.5
21
▾ DEMO-L3-EPC-1.8.13.5.1 DEMO-L3-EPC-1.8.13.5.1
4
DEMO-L3-EPC-1.8.13.5.1.1 Cable Tray Layout
4
▾ DEMO-L3-EPC-1.8.13.5.10 DEMO-L3-EPC-1.8.13.5.10
4
DEMO-L3-EPC-1.8.13.5.10.2 Grounding Layout
4
▾ DEMO-L3-EPC-1.8.13.5.2 DEMO-L3-EPC-1.8.13.5.2
8
DEMO-L3-EPC-1.8.13.5.2.1 Power Plan Layout
4
DEMO-L3-EPC-1.8.13.5.2.4 Power Panel Schedule
4
▾ DEMO-L3-EPC-1.8.13.5.3 DEMO-L3-EPC-1.8.13.5.3
5
DEMO-L3-EPC-1.8.13.5.3.1 Lighting & Small Power Layout
4
DEMO-L3-EPC-1.8.13.5.3.2 Lighting & Small Power Wiring Diagram
1
▾ DEMO-L3-EPC-1.8.13.6 DEMO-L3-EPC-1.8.13.6
28
▾ DEMO-L3-EPC-1.8.13.6.2 DEMO-L3-EPC-1.8.13.6.2
22
DEMO-L3-EPC-1.8.13.6.2.1 Instrumentation Hook Up Diagrams - Blending
4
DEMO-L3-EPC-1.8.13.6.2.2 Instrumentation Installation Diagrams - Blending
4
DEMO-L3-EPC-1.8.13.6.2.3 Instrument Location and JB Location Layout - Blending
4
DEMO-L3-EPC-1.8.13.6.2.4 Instrument Cable Routing Drawing - Blending
4
DEMO-L3-EPC-1.8.13.6.2.5 Instrument JB Schedule - Blending
4
DEMO-L3-EPC-1.8.13.6.2.6 MTO - Blending
2
▾ DEMO-L3-EPC-1.8.13.6.9 DEMO-L3-EPC-1.8.13.6.9
6
DEMO-L3-EPC-1.8.13.6.9.1 CCTV Layout - Blending
4
DEMO-L3-EPC-1.8.13.6.9.2 MTO - Blending
2
▾ DEMO-L3-EPC-1.8.13.8 DEMO-L3-EPC-1.8.13.8
16
▾ DEMO-L3-EPC-1.8.13.8.3 DEMO-L3-EPC-1.8.13.8.3
16
DEMO-L3-EPC-1.8.13.8.3.1 PFD - Blending Area
2
DEMO-L3-EPC-1.8.13.8.3.2 P&ID - Blending Area
6
DEMO-L3-EPC-1.8.13.8.3.3 UFD - Blending Area
2
DEMO-L3-EPC-1.8.13.8.3.4 PFD - Pigging Manifold
2
DEMO-L3-EPC-1.8.13.8.3.5 P&ID - Pigging Manifold
4
▾ DEMO-L3-EPC-1.8.14 DEMO-L3-EPC-1.8.14
135
▾ DEMO-L3-EPC-1.8.14.2 DEMO-L3-EPC-1.8.14.2
6
▾ DEMO-L3-EPC-1.8.14.2.1 DEMO-L3-EPC-1.8.14.2.1
6
DEMO-L3-EPC-1.8.14.2.1.1 Unit Plot Plan
4
DEMO-L3-EPC-1.8.14.2.1.2 Piping Isometrics
2
▾ DEMO-L3-EPC-1.8.14.3 DEMO-L3-EPC-1.8.14.3
26
▾ DEMO-L3-EPC-1.8.14.3.1 DEMO-L3-EPC-1.8.14.3.1
26
DEMO-L3-EPC-1.8.14.3.1.1 Mechanical Datasheets - Loading / Unloading Arms
2
DEMO-L3-EPC-1.8.14.3.1.2 Technical Requisition - Loading / Unloading Arms
4
DEMO-L3-EPC-1.8.14.3.1.3 Mechanical Datasheets - Filters / Truck / Railcar Scales
4
DEMO-L3-EPC-1.8.14.3.1.4 Technical Bid Evaluation
4
DEMO-L3-EPC-1.8.14.3.1.5 Technical Requisition - Filters / Truck / Railcar Scales
4
DEMO-L3-EPC-1.8.14.3.1.6 Mechanical Datasheets - Centrifugal Sealless Pumps
2
DEMO-L3-EPC-1.8.14.3.1.7 Technical Requisition - Centrifugal Sealless Pumps
4
DEMO-L3-EPC-1.8.14.3.1.9 Vendor Drawings Review
2
▾ DEMO-L3-EPC-1.8.14.4 DEMO-L3-EPC-1.8.14.4
34
▾ DEMO-L3-EPC-1.8.14.4.1 DEMO-L3-EPC-1.8.14.4.1
12
DEMO-L3-EPC-1.8.14.4.1.1 Design Calculation - Operator Shelter/Railway Loading/Truck Loading Canopy
3
DEMO-L3-EPC-1.8.14.4.1.2 Foundation GA & Details
3
DEMO-L3-EPC-1.8.14.4.1.3 Foundation Design Calculation - PARs P51, P52
3
DEMO-L3-EPC-1.8.14.4.1.4 Foundation GA & Details - PARs P51, P52
3
▾ DEMO-L3-EPC-1.8.14.4.2 DEMO-L3-EPC-1.8.14.4.2
6
DEMO-L3-EPC-1.8.14.4.2.1 Structural GA & Details - P52
3
DEMO-L3-EPC-1.8.14.4.2.2 Structural Design Calculation - P52
3
▾ DEMO-L3-EPC-1.8.14.4.3 DEMO-L3-EPC-1.8.14.4.3
10
DEMO-L3-EPC-1.8.14.4.3.13 Building & Archchitectural/Datasheet/Specification - Operator Shelter
3
DEMO-L3-EPC-1.8.14.4.3.2 Subcontracts Drawings Review
4
DEMO-L3-EPC-1.8.14.4.3.4 Technical Bid Evaluation - Subcontracts Drawings Review
3
▾ DEMO-L3-EPC-1.8.14.4.8 DEMO-L3-EPC-1.8.14.4.8
6
DEMO-L3-EPC-1.8.14.4.8.1 Structural GA & Details - P51
3
DEMO-L3-EPC-1.8.14.4.8.2 Structural Design Calculation - P51
3
▾ DEMO-L3-EPC-1.8.14.5 DEMO-L3-EPC-1.8.14.5
21
▾ DEMO-L3-EPC-1.8.14.5.1 DEMO-L3-EPC-1.8.14.5.1
4
DEMO-L3-EPC-1.8.14.5.1.2 Cable Tray Layout
4
▾ DEMO-L3-EPC-1.8.14.5.10 DEMO-L3-EPC-1.8.14.5.10
4
DEMO-L3-EPC-1.8.14.5.10.2 Grounding Layout
4
▾ DEMO-L3-EPC-1.8.14.5.2 DEMO-L3-EPC-1.8.14.5.2
8
DEMO-L3-EPC-1.8.14.5.2.1 Power Panel Schedule
4
DEMO-L3-EPC-1.8.14.5.2.4 Power Plan Layout
4
▾ DEMO-L3-EPC-1.8.14.5.3 DEMO-L3-EPC-1.8.14.5.3
5
DEMO-L3-EPC-1.8.14.5.3.1 Lighting & Small Power Layout
4
DEMO-L3-EPC-1.8.14.5.3.2 Lighting & Small Power Wiring Diagram
1
▾ DEMO-L3-EPC-1.8.14.6 DEMO-L3-EPC-1.8.14.6
40
▾ DEMO-L3-EPC-1.8.14.6.1 DEMO-L3-EPC-1.8.14.6.1
4
DEMO-L3-EPC-1.8.14.6.1.1 CCTV Layout - Truck & Rail Loading / Unloading
4
▾ DEMO-L3-EPC-1.8.14.6.3 DEMO-L3-EPC-1.8.14.6.3
22
DEMO-L3-EPC-1.8.14.6.3.1 Instrumentation Hook Up Diagrams - Truck & Rail Loading / Unloading
4
DEMO-L3-EPC-1.8.14.6.3.2 Instrumentation Installation Diagrams - Truck & Rail Loading / Unloading
4
DEMO-L3-EPC-1.8.14.6.3.3 Instrument Location and JB Location Layout - Truck & Rail Loading / Unloading
4
DEMO-L3-EPC-1.8.14.6.3.4 Instrument Cable Routing Drawing - Truck & Rail Loading / Unloading
4
DEMO-L3-EPC-1.8.14.6.3.5 Instrument JB Schedule - Truck & Rail Loading / Unloading
4
DEMO-L3-EPC-1.8.14.6.3.6 Bulk MTO - Truck & Rail Loading / Unloading
2
▾ DEMO-L3-EPC-1.8.14.6.4 DEMO-L3-EPC-1.8.14.6.4
4
DEMO-L3-EPC-1.8.14.6.4.1 PAGA Layout - Truck & Rail Loading / Unloading
4
▾ DEMO-L3-EPC-1.8.14.6.6 DEMO-L3-EPC-1.8.14.6.6
6
DEMO-L3-EPC-1.8.14.6.6.1 ACS Layout - Truck & Rail Loading / Unloading
4
DEMO-L3-EPC-1.8.14.6.6.2 MTO - Truck & Rail Loading Area
2
▾ DEMO-L3-EPC-1.8.14.6.9 DEMO-L3-EPC-1.8.14.6.9
4
DEMO-L3-EPC-1.8.14.6.9.1 Network Systems Equipment Layout - Truck & Rail Loading / Unloading
4
▾ DEMO-L3-EPC-1.8.14.8 DEMO-L3-EPC-1.8.14.8
8
▾ DEMO-L3-EPC-1.8.14.8.3 DEMO-L3-EPC-1.8.14.8.3
8
DEMO-L3-EPC-1.8.14.8.3.1 PFDs
2
DEMO-L3-EPC-1.8.14.8.3.2 P&IDs
6
▾ DEMO-L3-EPC-1.8.15 DEMO-L3-EPC-1.8.15
114
▾ DEMO-L3-EPC-1.8.15.1 DEMO-L3-EPC-1.8.15.1
20
DEMO-L3-EPC-1.8.15.1.1 nstrumentation Installation Diagrams (Vapour Recovery)
4
DEMO-L3-EPC-1.8.15.1.2 Instrument Location and JB Location Layout (Vapour Recovery)
4
DEMO-L3-EPC-1.8.15.1.3 Instrument Junction Box Wiring (Vapour Recovery)
4
DEMO-L3-EPC-1.8.15.1.4 Instrument Hook Up Diagram (Vapour Recovery
4
DEMO-L3-EPC-1.8.15.1.5 Instrument Cable Routing Drawing (Vapour Recovery)
4
▾ DEMO-L3-EPC-1.8.15.2 DEMO-L3-EPC-1.8.15.2
21
▾ DEMO-L3-EPC-1.8.15.2.1 DEMO-L3-EPC-1.8.15.2.1
5
DEMO-L3-EPC-1.8.15.2.1.1 Lighting & Small Power Layout
4
DEMO-L3-EPC-1.8.15.2.1.2 Lighting & Small Power Wiring Diagram
1
▾ DEMO-L3-EPC-1.8.15.2.10 DEMO-L3-EPC-1.8.15.2.10
4
DEMO-L3-EPC-1.8.15.2.10.2 Grounding Layout
4
▾ DEMO-L3-EPC-1.8.15.2.2 DEMO-L3-EPC-1.8.15.2.2
8
DEMO-L3-EPC-1.8.15.2.2.1 Power Panel Schedule
4
DEMO-L3-EPC-1.8.15.2.2.3 Power Plan Layout
4
▾ DEMO-L3-EPC-1.8.15.2.5 DEMO-L3-EPC-1.8.15.2.5
4
DEMO-L3-EPC-1.8.15.2.5.2 Cable Tray Layout
4
▾ DEMO-L3-EPC-1.8.15.3 DEMO-L3-EPC-1.8.15.3
5
▾ DEMO-L3-EPC-1.8.15.3.1 DEMO-L3-EPC-1.8.15.3.1
5
DEMO-L3-EPC-1.8.15.3.1.1 Unit Plot Plan
4
DEMO-L3-EPC-1.8.15.3.1.2 Piping Isometrics
1
▾ DEMO-L3-EPC-1.8.15.4 DEMO-L3-EPC-1.8.15.4
25
▾ DEMO-L3-EPC-1.8.15.4.1 DEMO-L3-EPC-1.8.15.4.1
6
DEMO-L3-EPC-1.8.15.4.1.1 Foundation GA & Details
3
DEMO-L3-EPC-1.8.15.4.1.2 Civil Design Calculation
3
▾ DEMO-L3-EPC-1.8.15.4.2 DEMO-L3-EPC-1.8.15.4.2
12
DEMO-L3-EPC-1.8.15.4.2.1 Civil Design Calculation
6
DEMO-L3-EPC-1.8.15.4.2.2 Foundation GA & Details
6
▾ DEMO-L3-EPC-1.8.15.4.3 DEMO-L3-EPC-1.8.15.4.3
7
DEMO-L3-EPC-1.8.15.4.3.1 Civil Design Calculation
3
DEMO-L3-EPC-1.8.15.4.3.14 Building & Archchitectural/Datasheet/Specification - VNB Storage Shelter
2
DEMO-L3-EPC-1.8.15.4.3.3 Subcontracts Drawings Review
1
DEMO-L3-EPC-1.8.15.4.3.4 Technical Bid Evaluation
1
▾ DEMO-L3-EPC-1.8.15.5 DEMO-L3-EPC-1.8.15.5
8
▾ DEMO-L3-EPC-1.8.15.5.3 DEMO-L3-EPC-1.8.15.5.3
8
DEMO-L3-EPC-1.8.15.5.3.1 UFDs
2
DEMO-L3-EPC-1.8.15.5.3.2 P&IDs
6
▾ DEMO-L3-EPC-1.8.15.7 DEMO-L3-EPC-1.8.15.7
35
▾ DEMO-L3-EPC-1.8.15.7.1 DEMO-L3-EPC-1.8.15.7.1
10
DEMO-L3-EPC-1.8.15.7.1.1 Mechanical Datasheets
4
DEMO-L3-EPC-1.8.15.7.1.2 Technical Requisition
4
DEMO-L3-EPC-1.8.15.7.1.3 Technical Bid Evaluation
1
DEMO-L3-EPC-1.8.15.7.1.4 Vendor Drawings Review
1
▾ DEMO-L3-EPC-1.8.15.7.2 DEMO-L3-EPC-1.8.15.7.2
10
DEMO-L3-EPC-1.8.15.7.2.1 Technical Requisition - Instrument Air Generation Package
4
DEMO-L3-EPC-1.8.15.7.2.2 Mechanical Datasheet - Instrument Air Generation Package
4
DEMO-L3-EPC-1.8.15.7.2.4 Technical Bid Evaluation
1
DEMO-L3-EPC-1.8.15.7.2.8 Vendor Drawings Review
1
▾ DEMO-L3-EPC-1.8.15.7.3 DEMO-L3-EPC-1.8.15.7.3
15
DEMO-L3-EPC-1.8.15.7.3.2 Mechanical Datasheet - Vessels / Drums
2
DEMO-L3-EPC-1.8.15.7.3.3 Technical Requisition - Vessels / Drums
4
DEMO-L3-EPC-1.8.15.7.3.4 Technical Bid Evaluation
2
DEMO-L3-EPC-1.8.15.7.3.5 Vendor Drawings Review
1
DEMO-L3-EPC-1.8.15.7.3.6 Technical Requisition - Carbon Beds
6
▾ DEMO-L3-EPC-1.8.16 DEMO-L3-EPC-1.8.16
241
▾ DEMO-L3-EPC-1.8.16.2 DEMO-L3-EPC-1.8.16.2
44
▾ DEMO-L3-EPC-1.8.16.2.1 DEMO-L3-EPC-1.8.16.2.1
44
DEMO-L3-EPC-1.8.16.2.1.1 Mechanical Datasheet
8
DEMO-L3-EPC-1.8.16.2.1.2 Technical Bid Evaluation
6
DEMO-L3-EPC-1.8.16.2.1.3 Vendor Drawings Review
3
DEMO-L3-EPC-1.8.16.2.1.4 Technical Requisition - Hot water heater
4
DEMO-L3-EPC-1.8.16.2.1.5 Technical Requisition - Steam Genration Boiler Package
4
DEMO-L3-EPC-1.8.16.2.1.6 Technical Requisition - Hot Water Module Package
7
DEMO-L3-EPC-1.8.16.2.1.7 Mechanical Datasheet - Chiller Package
4
DEMO-L3-EPC-1.8.16.2.1.8 Technical Requisition - Chiller Package
4
DEMO-L3-EPC-1.8.16.2.1.9 Mechanical Datasheet - Sanitary sewer Pump
4
▾ DEMO-L3-EPC-1.8.16.3 DEMO-L3-EPC-1.8.16.3
19
▾ DEMO-L3-EPC-1.8.16.3.3 DEMO-L3-EPC-1.8.16.3.3
19
DEMO-L3-EPC-1.8.16.3.3.1 UFDs
2
▾ DEMO-L3-EPC-1.8.16.3.3.2 DEMO-L3-EPC-1.8.16.3.3.2
17
DEMO-L3-EPC-1.8.16.3.3.2.1 Steam Generation
7
DEMO-L3-EPC-1.8.16.3.3.2.2 Chiller Package
5
DEMO-L3-EPC-1.8.16.3.3.2.3 Hot water Heater
5
▾ DEMO-L3-EPC-1.8.16.4 DEMO-L3-EPC-1.8.16.4
33
▾ DEMO-L3-EPC-1.8.16.4.1 DEMO-L3-EPC-1.8.16.4.1
12
DEMO-L3-EPC-1.8.16.4.1.1 Foundation Design Calculation - Transformer / Substation
3
DEMO-L3-EPC-1.8.16.4.1.2 Foundation GA & Details - Transformer / Substation
3
DEMO-L3-EPC-1.8.16.4.1.3 Foundation Design Calculation - PARs P71, P72
3
DEMO-L3-EPC-1.8.16.4.1.4 Foundation GA & Details - PARs P71, P72
3
▾ DEMO-L3-EPC-1.8.16.4.2 DEMO-L3-EPC-1.8.16.4.2
6
DEMO-L3-EPC-1.8.16.4.2.1 Civil Design Calculation
3
DEMO-L3-EPC-1.8.16.4.2.2 Foundation GA & Details
3
▾ DEMO-L3-EPC-1.8.16.4.3 DEMO-L3-EPC-1.8.16.4.3
3
DEMO-L3-EPC-1.8.16.4.3.2 Misc Steel Details
3
▾ DEMO-L3-EPC-1.8.16.4.4 DEMO-L3-EPC-1.8.16.4.4
6
DEMO-L3-EPC-1.8.16.4.4.1 Structural GA & Details - PAR P72
3
DEMO-L3-EPC-1.8.16.4.4.2 Structural Design Calculation - PAR P72
3
▾ DEMO-L3-EPC-1.8.16.4.8 DEMO-L3-EPC-1.8.16.4.8
6
DEMO-L3-EPC-1.8.16.4.8.1 Structural GA & Details - PAR P71
3
DEMO-L3-EPC-1.8.16.4.8.2 Structural Design Calculation - PAR P71
3
▾ DEMO-L3-EPC-1.8.16.5 DEMO-L3-EPC-1.8.16.5
101
▾ DEMO-L3-EPC-1.8.16.5.1 DEMO-L3-EPC-1.8.16.5.1
4
DEMO-L3-EPC-1.8.16.5.1.2 Cable Tray Layout
4
▾ DEMO-L3-EPC-1.8.16.5.10 DEMO-L3-EPC-1.8.16.5.10
4
DEMO-L3-EPC-1.8.16.5.10.2 Grounding Layout
4
▾ DEMO-L3-EPC-1.8.16.5.2 DEMO-L3-EPC-1.8.16.5.2
8
DEMO-L3-EPC-1.8.16.5.2.1 Power Panel Schedule
4
DEMO-L3-EPC-1.8.16.5.2.6 Power Plan Layout
4
▾ DEMO-L3-EPC-1.8.16.5.3 DEMO-L3-EPC-1.8.16.5.3
5
DEMO-L3-EPC-1.8.16.5.3.1 Lighting & Small Power Layout
4
DEMO-L3-EPC-1.8.16.5.3.2 Lighting & Small Power Wiring Diagram
1
▾ DEMO-L3-EPC-1.8.16.5.4 DEMO-L3-EPC-1.8.16.5.4
1
DEMO-L3-EPC-1.8.16.5.4.1 Interconnecting Diagram
1
▾ DEMO-L3-EPC-1.8.16.5.5 DEMO-L3-EPC-1.8.16.5.5
67
DEMO-L3-EPC-1.8.16.5.5.1 Electrical Datasheet - Batteries & Charges
2
DEMO-L3-EPC-1.8.16.5.5.10 Electrical Datasheet - Power Distribution Center
2
DEMO-L3-EPC-1.8.16.5.5.18 Electrical Specifications
13
DEMO-L3-EPC-1.8.16.5.5.2 Substation Equipment Layout
2
DEMO-L3-EPC-1.8.16.5.5.22 Vendor Document Review
5
DEMO-L3-EPC-1.8.16.5.5.24 Technical Requisition - Static PWM UPS & Batteries & Charges
4
DEMO-L3-EPC-1.8.16.5.5.25 Technical Requisition - Non-Segregated LV Bus Duct
4
DEMO-L3-EPC-1.8.16.5.5.28 Technical Requisition - Electrical Heat Tracing
4
DEMO-L3-EPC-1.8.16.5.5.29 Technical Requisition - Power Distribution Center
4
DEMO-L3-EPC-1.8.16.5.5.3 Technical Requisition - LV Transformer 34.5KV/ 0.48KV
2
DEMO-L3-EPC-1.8.16.5.5.31 Technical Requisition - MV Switchgear
2
DEMO-L3-EPC-1.8.16.5.5.33 Technical Bid Evaluation
7
DEMO-L3-EPC-1.8.16.5.5.35 Electrical Datasheet - Static PWM UPS
2
DEMO-L3-EPC-1.8.16.5.5.4 Typical LV MCC Schematic
4
DEMO-L3-EPC-1.8.16.5.5.5 Electrical Datasheet - Non-Segregated LV Bus Duct
2
DEMO-L3-EPC-1.8.16.5.5.6 Electrical Datasheet - LV Transformer 34.5KV/ 0.48KV
2
DEMO-L3-EPC-1.8.16.5.5.7 Electrical Datasheet - LV MCC
2
DEMO-L3-EPC-1.8.16.5.5.8 Electrical Datasheet - LV Switchgear
2
DEMO-L3-EPC-1.8.16.5.5.9 Electrical Datasheet - MV Switchgear
2
▾ DEMO-L3-EPC-1.8.16.5.9 DEMO-L3-EPC-1.8.16.5.9
12
DEMO-L3-EPC-1.8.16.5.9.1 Overall Single Line Diagram
2
DEMO-L3-EPC-1.8.16.5.9.2 Single Line Diagram
2
DEMO-L3-EPC-1.8.16.5.9.3 Single Line Diagram - Protective Relaying
2
DEMO-L3-EPC-1.8.16.5.9.4 Single Line Diagram - AC & DC UPS
2
DEMO-L3-EPC-1.8.16.5.9.5 Single Line Diagram - MCC-01A / 01B
4
▾ DEMO-L3-EPC-1.8.16.6 DEMO-L3-EPC-1.8.16.6
42
▾ DEMO-L3-EPC-1.8.16.6.1 DEMO-L3-EPC-1.8.16.6.1
24
DEMO-L3-EPC-1.8.16.6.1.1 Instrumentation Installation Diagrams (SubStation)
4
DEMO-L3-EPC-1.8.16.6.1.2 Instrument Hook Up Diagram (SubStation)
4
DEMO-L3-EPC-1.8.16.6.1.3 Instrument Location and JB Location Layout (SubStation)
4
DEMO-L3-EPC-1.8.16.6.1.4 Instrument Cable Routing Drawing - Substation
4
DEMO-L3-EPC-1.8.16.6.1.5 Instrument Junction Box Wiring (SubStation)
4
DEMO-L3-EPC-1.8.16.6.1.6 Instrument Cable Routing Drawing - Substation (Re included)
4
▾ DEMO-L3-EPC-1.8.16.6.2 DEMO-L3-EPC-1.8.16.6.2
4
DEMO-L3-EPC-1.8.16.6.2.1 CCTV Layout - Substation
4
▾ DEMO-L3-EPC-1.8.16.6.4 DEMO-L3-EPC-1.8.16.6.4
4
DEMO-L3-EPC-1.8.16.6.4.1 PAGA Layout - Substation
4
▾ DEMO-L3-EPC-1.8.16.6.6 DEMO-L3-EPC-1.8.16.6.6
6
DEMO-L3-EPC-1.8.16.6.6.1 ACS Layout - Substation
4
DEMO-L3-EPC-1.8.16.6.6.2 MTO - Substation
2
▾ DEMO-L3-EPC-1.8.16.6.9 DEMO-L3-EPC-1.8.16.6.9
4
DEMO-L3-EPC-1.8.16.6.9.1 Network Systems Equipment Layout - Substation
4
▾ DEMO-L3-EPC-1.8.16.8 DEMO-L3-EPC-1.8.16.8
2
▾ DEMO-L3-EPC-1.8.16.8.1 DEMO-L3-EPC-1.8.16.8.1
2
DEMO-L3-EPC-1.8.16.8.1.1 Piping Isometrics
2
▾ DEMO-L3-EPC-1.8.17 DEMO-L3-EPC-1.8.17
55
▾ DEMO-L3-EPC-1.8.17.2 DEMO-L3-EPC-1.8.17.2
2
▾ DEMO-L3-EPC-1.8.17.2.1 DEMO-L3-EPC-1.8.17.2.1
2
DEMO-L3-EPC-1.8.17.2.1.1 Piping Isometrics
2
▾ DEMO-L3-EPC-1.8.17.3 DEMO-L3-EPC-1.8.17.3
8
▾ DEMO-L3-EPC-1.8.17.3.1 DEMO-L3-EPC-1.8.17.3.1
8
DEMO-L3-EPC-1.8.17.3.1.1 Mechanical Datasheet - Forklifts
2
DEMO-L3-EPC-1.8.17.3.1.2 Technical Bid Evaluation - Forklifts
1
DEMO-L3-EPC-1.8.17.3.1.3 Vendor Drawings Review
1
DEMO-L3-EPC-1.8.17.3.1.6 Technical Requisition - Forklifts
4
▾ DEMO-L3-EPC-1.8.17.4 DEMO-L3-EPC-1.8.17.4
24
▾ DEMO-L3-EPC-1.8.17.4.1 DEMO-L3-EPC-1.8.17.4.1
24
DEMO-L3-EPC-1.8.17.4.1.1 Foundation GA & Details
3
DEMO-L3-EPC-1.8.17.4.1.2 Structural Design Calculation
9
DEMO-L3-EPC-1.8.17.4.1.3 Structural GA & Details
9
DEMO-L3-EPC-1.8.17.4.1.6 Civil Design Calculation
3
▾ DEMO-L3-EPC-1.8.17.5 DEMO-L3-EPC-1.8.17.5
21
▾ DEMO-L3-EPC-1.8.17.5.1 DEMO-L3-EPC-1.8.17.5.1
8
DEMO-L3-EPC-1.8.17.5.1.2 Power Plan Layout
4
DEMO-L3-EPC-1.8.17.5.1.3 Power Panel Schedule
4
▾ DEMO-L3-EPC-1.8.17.5.10 DEMO-L3-EPC-1.8.17.5.10
4
DEMO-L3-EPC-1.8.17.5.10.2 Grounding Layout
4
▾ DEMO-L3-EPC-1.8.17.5.6 DEMO-L3-EPC-1.8.17.5.6
4
DEMO-L3-EPC-1.8.17.5.6.2 Cable Tray Layout
4
▾ DEMO-L3-EPC-1.8.17.5.7 DEMO-L3-EPC-1.8.17.5.7
5
DEMO-L3-EPC-1.8.17.5.7.1 Lighting & Small Power Layout
4
DEMO-L3-EPC-1.8.17.5.7.2 Lighting & Small Power Wiring Diagram
1
▾ DEMO-L3-EPC-1.8.18 DEMO-L3-EPC-1.8.18
114
▾ DEMO-L3-EPC-1.8.18.2 DEMO-L3-EPC-1.8.18.2
6
▾ DEMO-L3-EPC-1.8.18.2.1 DEMO-L3-EPC-1.8.18.2.1
6
DEMO-L3-EPC-1.8.18.2.1.1 Unit Plot Plan
4
DEMO-L3-EPC-1.8.18.2.1.2 Piping Isometrics
2
▾ DEMO-L3-EPC-1.8.18.3 DEMO-L3-EPC-1.8.18.3
22
▾ DEMO-L3-EPC-1.8.18.3.3 DEMO-L3-EPC-1.8.18.3.3
22
DEMO-L3-EPC-1.8.18.3.3.1 Instrumentation Hook Up Diagrams - Tankfarm Small
4
DEMO-L3-EPC-1.8.18.3.3.2 Instrumentation Installation Diagrams - Tankfarm Small
4
DEMO-L3-EPC-1.8.18.3.3.3 Instrument Location and JB Location Layout - Tankfarm Small
4
DEMO-L3-EPC-1.8.18.3.3.4 Instrument Cable Routing Drawing - Tankfarm Small / Warehouse
4
DEMO-L3-EPC-1.8.18.3.3.5 Instrument JB Schedule - Tankfarm Small
4
DEMO-L3-EPC-1.8.18.3.3.6 Bulk MTO - Tankfarm Small
2
▾ DEMO-L3-EPC-1.8.18.4 DEMO-L3-EPC-1.8.18.4
42
▾ DEMO-L3-EPC-1.8.18.4.1 DEMO-L3-EPC-1.8.18.4.1
15
DEMO-L3-EPC-1.8.18.4.1.1 Foundation Design Calculation of Tanks / Dyke Wall
3
DEMO-L3-EPC-1.8.18.4.1.2 Foundation GA & Details - PARs P91, P92, P93
3
DEMO-L3-EPC-1.8.18.4.1.3 Foundation Design Calculation - PARs P91, P92, P93
3
DEMO-L3-EPC-1.8.18.4.1.4 Foundation GA & Details - Tanks
3
DEMO-L3-EPC-1.8.18.4.1.5 Foundation GA & Details - Sump (300 gallon)
3
▾ DEMO-L3-EPC-1.8.18.4.2 DEMO-L3-EPC-1.8.18.4.2
6
DEMO-L3-EPC-1.8.18.4.2.1 Dyke Wall Layout
3
DEMO-L3-EPC-1.8.18.4.2.8 Dyke Wall Details, Elevations & Sections
3
▾ DEMO-L3-EPC-1.8.18.4.4 DEMO-L3-EPC-1.8.18.4.4
3
DEMO-L3-EPC-1.8.18.4.4.1 Misc Steel Detail
3
▾ DEMO-L3-EPC-1.8.18.4.5 DEMO-L3-EPC-1.8.18.4.5
6
DEMO-L3-EPC-1.8.18.4.5.1 Structural GA & Details - PAR P91
3
DEMO-L3-EPC-1.8.18.4.5.2 Structural Design Calculation - PAR P91
3
▾ DEMO-L3-EPC-1.8.18.4.6 DEMO-L3-EPC-1.8.18.4.6
6
DEMO-L3-EPC-1.8.18.4.6.1 Structural GA & Details - PAR P92
3
DEMO-L3-EPC-1.8.18.4.6.2 Structural Design Calculation - PAR P92
3
▾ DEMO-L3-EPC-1.8.18.4.7 DEMO-L3-EPC-1.8.18.4.7
6
DEMO-L3-EPC-1.8.18.4.7.1 Structural GA & Details - PAR P93
3
DEMO-L3-EPC-1.8.18.4.7.2 Structural Design Calculation - PAR P93
3
▾ DEMO-L3-EPC-1.8.18.5 DEMO-L3-EPC-1.8.18.5
21
▾ DEMO-L3-EPC-1.8.18.5.1 DEMO-L3-EPC-1.8.18.5.1
8
DEMO-L3-EPC-1.8.18.5.1.2 Power Plan Layout
4
DEMO-L3-EPC-1.8.18.5.1.3 Power Panel Schedule
4
▾ DEMO-L3-EPC-1.8.18.5.10 DEMO-L3-EPC-1.8.18.5.10
4
DEMO-L3-EPC-1.8.18.5.10.2 Grounding Layout
4
▾ DEMO-L3-EPC-1.8.18.5.6 DEMO-L3-EPC-1.8.18.5.6
4
DEMO-L3-EPC-1.8.18.5.6.2 Cable Tray Layout
4
▾ DEMO-L3-EPC-1.8.18.5.7 DEMO-L3-EPC-1.8.18.5.7
5
DEMO-L3-EPC-1.8.18.5.7.1 Lighting & Small Power Layout
4
DEMO-L3-EPC-1.8.18.5.7.2 Lighting & Small Power Wiring Diagram
1
▾ DEMO-L3-EPC-1.8.18.6 DEMO-L3-EPC-1.8.18.6
8
▾ DEMO-L3-EPC-1.8.18.6.3 DEMO-L3-EPC-1.8.18.6.3
8
DEMO-L3-EPC-1.8.18.6.3.1 PFDs
2
DEMO-L3-EPC-1.8.18.6.3.2 P&IDs
6
▾ DEMO-L3-EPC-1.8.18.8 DEMO-L3-EPC-1.8.18.8
15
▾ DEMO-L3-EPC-1.8.18.8.3 DEMO-L3-EPC-1.8.18.8.3
15
DEMO-L3-EPC-1.8.18.8.3.2 Mechanical Datasheet - Shop Fabricated Storage Tanks
2
DEMO-L3-EPC-1.8.18.8.3.3 Technical Requisition - Shop Fabricated Storage Tanks
4
DEMO-L3-EPC-1.8.18.8.3.4 Technical Bid Evaluation
2
DEMO-L3-EPC-1.8.18.8.3.5 Technical Requisition - Static Mixers
4
DEMO-L3-EPC-1.8.18.8.3.6 Vendor Drawings Review
1
DEMO-L3-EPC-1.8.18.8.3.9 Mechanical Datasheet - Static Mixers
2
▾ DEMO-L3-EPC-1.8.7 DEMO-L3-EPC-1.8.7
602
▾ DEMO-L3-EPC-1.8.7.1 DEMO-L3-EPC-1.8.7.1
77
▾ DEMO-L3-EPC-1.8.7.1.2 DEMO-L3-EPC-1.8.7.1.2
16
DEMO-L3-EPC-1.8.7.1.2.1 RR Plan - Geometry / Grading / Drainage /Track Profile
3
DEMO-L3-EPC-1.8.7.1.2.2 Railroad Details
3
DEMO-L3-EPC-1.8.7.1.2.3 Railroad Overall Plot Plan
4
DEMO-L3-EPC-1.8.7.1.2.4 General Notes - Grading
3
DEMO-L3-EPC-1.8.7.1.2.5 Grading & Drainage Plan
3
▾ DEMO-L3-EPC-1.8.7.1.6 DEMO-L3-EPC-1.8.7.1.6
61
DEMO-L3-EPC-1.8.7.1.6.1 General Activities
2
DEMO-L3-EPC-1.8.7.1.6.10 Site Prep & Underground Obstruction Survey
2
DEMO-L3-EPC-1.8.7.1.6.16 Steel / General Notes
2
DEMO-L3-EPC-1.8.7.1.6.18 Miscellaneous
27
DEMO-L3-EPC-1.8.7.1.6.2 Standard Drawing for Drainage
3
DEMO-L3-EPC-1.8.7.1.6.3 Steel Connection Drawings
3
DEMO-L3-EPC-1.8.7.1.6.4 Technical Requisition - Truck Loading / Railway Loading Canopy
5
DEMO-L3-EPC-1.8.7.1.6.5 Typical Fabrication Details
3
DEMO-L3-EPC-1.8.7.1.6.6 Demolition Plan
3
DEMO-L3-EPC-1.8.7.1.6.7 Clearing & Grubbing
3
DEMO-L3-EPC-1.8.7.1.6.8 Plan Detail for Routing Waste Water Line
3
DEMO-L3-EPC-1.8.7.1.6.9 CSA Basis of Design
5
▾ DEMO-L3-EPC-1.8.7.2 DEMO-L3-EPC-1.8.7.2
85
▾ DEMO-L3-EPC-1.8.7.2.1 DEMO-L3-EPC-1.8.7.2.1
5
DEMO-L3-EPC-1.8.7.2.1.1 Piping Isometrics & GAs
5
▾ DEMO-L3-EPC-1.8.7.2.8 DEMO-L3-EPC-1.8.7.2.8
80
DEMO-L3-EPC-1.8.7.2.8.1 Utility Station Drawing
4
DEMO-L3-EPC-1.8.7.2.8.10 Technical Requisition - Piping Special Supports
4
DEMO-L3-EPC-1.8.7.2.8.12 MTO
4
DEMO-L3-EPC-1.8.7.2.8.13 Specifications - Piping Special Supports
2
DEMO-L3-EPC-1.8.7.2.8.14 Technical Bid Evaluation
4
DEMO-L3-EPC-1.8.7.2.8.15 Technical Requisition - Piping Bulk Items (Not required to check)
4
DEMO-L3-EPC-1.8.7.2.8.16 Piping Design Basis
2
DEMO-L3-EPC-1.8.7.2.8.17 Specifications - Pigging Manifold
2
DEMO-L3-EPC-1.8.7.2.8.18 Technical Requisition - Piping Specialty Items
4
DEMO-L3-EPC-1.8.7.2.8.19 Specifications - Coating, Fire Proofing, Insulation
2
DEMO-L3-EPC-1.8.7.2.8.2 General Activities
7
DEMO-L3-EPC-1.8.7.2.8.20 Technical Requisition - U/g Piping - HDPE (Not required to check)
4
DEMO-L3-EPC-1.8.7.2.8.21 Critical Line List
1
DEMO-L3-EPC-1.8.7.2.8.22 Ug Layout sewer
1
DEMO-L3-EPC-1.8.7.2.8.3 Piping Stress Report
1
DEMO-L3-EPC-1.8.7.2.8.4 Piping 3D Modelling
15
DEMO-L3-EPC-1.8.7.2.8.5 Piping Datasheets
3
DEMO-L3-EPC-1.8.7.2.8.6 Plot Plans
5
DEMO-L3-EPC-1.8.7.2.8.7 Standards and Specifications
3
DEMO-L3-EPC-1.8.7.2.8.8 Technical Requisition - Pigging Manifold
4
DEMO-L3-EPC-1.8.7.2.8.9 Piping Tie-In Key Plan
4
▾ DEMO-L3-EPC-1.8.7.3 DEMO-L3-EPC-1.8.7.3
20
▾ DEMO-L3-EPC-1.8.7.3.4 DEMO-L3-EPC-1.8.7.3.4
20
DEMO-L3-EPC-1.8.7.3.4.1 General Activities
2
DEMO-L3-EPC-1.8.7.3.4.17 HVAC Design Basis & Control Philosophy
1
DEMO-L3-EPC-1.8.7.3.4.2 Mechanical Equipment List
1
DEMO-L3-EPC-1.8.7.3.4.3 Mechanical Equipment Specifications
1
DEMO-L3-EPC-1.8.7.3.4.4 Standard Vessel Drawings
1
DEMO-L3-EPC-1.8.7.3.4.5 HVAC Equipment Schedule
2
DEMO-L3-EPC-1.8.7.3.4.6 Mobile drain Pot
9
DEMO-L3-EPC-1.8.7.3.4.7 Material Selection Diagram
2
DEMO-L3-EPC-1.8.7.3.4.8 HVAC Equipment Specification
1
▾ DEMO-L3-EPC-1.8.7.4 DEMO-L3-EPC-1.8.7.4
67
▾ DEMO-L3-EPC-1.8.7.4.3 DEMO-L3-EPC-1.8.7.4.3
67
DEMO-L3-EPC-1.8.7.4.3.1 HMB/PFD/UFD
8
DEMO-L3-EPC-1.8.7.4.3.10 Relief Valve Sizing / Pump Sizing / Hydraulic Sizing Report
2
DEMO-L3-EPC-1.8.7.4.3.11 Process Operating Guide
2
DEMO-L3-EPC-1.8.7.4.3.12 P&ID Sewer System
5
DEMO-L3-EPC-1.8.7.4.3.13 P&ID Seals
5
DEMO-L3-EPC-1.8.7.4.3.2 P&IDs
6
DEMO-L3-EPC-1.8.7.4.3.3 Process Design Basis
2
DEMO-L3-EPC-1.8.7.4.3.4 General Activities
2
DEMO-L3-EPC-1.8.7.4.3.5 Process Summary
11
DEMO-L3-EPC-1.8.7.4.3.6 DPDT Diagrams
2
DEMO-L3-EPC-1.8.7.4.3.7 Process Line List
4
DEMO-L3-EPC-1.8.7.4.3.8 Loadsheets
16
DEMO-L3-EPC-1.8.7.4.3.9 Process Description
2
▾ DEMO-L3-EPC-1.8.7.5 DEMO-L3-EPC-1.8.7.5
87
▾ DEMO-L3-EPC-1.8.7.5.9 DEMO-L3-EPC-1.8.7.5.9
87
DEMO-L3-EPC-1.8.7.5.9.1 General Activities
5
DEMO-L3-EPC-1.8.7.5.9.10 HAZOP
9
DEMO-L3-EPC-1.8.7.5.9.11 VDR
1
DEMO-L3-EPC-1.8.7.5.9.12 Hazardous Area Classification
4
DEMO-L3-EPC-1.8.7.5.9.14 Technical Requisition - Fire Protection Equipment
4
DEMO-L3-EPC-1.8.7.5.9.15 Technical Requisition - Foam System
4
DEMO-L3-EPC-1.8.7.5.9.16 Fireproofing Layout
4
DEMO-L3-EPC-1.8.7.5.9.19 Safety Line List
4
DEMO-L3-EPC-1.8.7.5.9.2 UFD - Firewater System
3
DEMO-L3-EPC-1.8.7.5.9.22 Escape Route & Fire Protection Equipment Layout
4
DEMO-L3-EPC-1.8.7.5.9.24 Specification - Safety Equipment Package
2
DEMO-L3-EPC-1.8.7.5.9.25 Specification - Clean Agent System
2
DEMO-L3-EPC-1.8.7.5.9.26 Fire Water Demand Calculation and Report
3
DEMO-L3-EPC-1.8.7.5.9.27 Fire Water Network Hydraulic Calculation
3
DEMO-L3-EPC-1.8.7.5.9.28 Technical Safety Philosophy
2
DEMO-L3-EPC-1.8.7.5.9.29 UFD - Foam System
3
DEMO-L3-EPC-1.8.7.5.9.3 P&ID - Firewater System
4
DEMO-L3-EPC-1.8.7.5.9.30 P&ID - Foam System
4
DEMO-L3-EPC-1.8.7.5.9.31 Fire Detection & Alarm System Overall Layout
4
DEMO-L3-EPC-1.8.7.5.9.4 Scope of Work - Fire Deluge system
1
DEMO-L3-EPC-1.8.7.5.9.5 Technical Safety Datasheet - Safety Equipment
4
DEMO-L3-EPC-1.8.7.5.9.6 MTO
1
DEMO-L3-EPC-1.8.7.5.9.7 Technical Bid Evaluation
4
DEMO-L3-EPC-1.8.7.5.9.8 Technical Requisition - Safety Equipment
4
DEMO-L3-EPC-1.8.7.5.9.9 Technical Requisition - Deluge System
4
▾ DEMO-L3-EPC-1.8.7.6 DEMO-L3-EPC-1.8.7.6
63
▾ DEMO-L3-EPC-1.8.7.6.10 DEMO-L3-EPC-1.8.7.6.10
8
DEMO-L3-EPC-1.8.7.6.10.2 Grounding Layout
4
DEMO-L3-EPC-1.8.7.6.10.4 Grounding Installation Details
4
▾ DEMO-L3-EPC-1.8.7.6.8 DEMO-L3-EPC-1.8.7.6.8
55
DEMO-L3-EPC-1.8.7.6.8.1 General Activities
3
DEMO-L3-EPC-1.8.7.6.8.10 Electrical Study - Load Flow, Short Circuit & Motor Starting
2
DEMO-L3-EPC-1.8.7.6.8.12 Electrical Design Basis
1
DEMO-L3-EPC-1.8.7.6.8.13 Electrical Equipment List
3
DEMO-L3-EPC-1.8.7.6.8.14 Calculation - Cable Tray Sizing
3
DEMO-L3-EPC-1.8.7.6.8.15 Cable Tray Installation Details
4
DEMO-L3-EPC-1.8.7.6.8.16 Lighting Installation Details
4
DEMO-L3-EPC-1.8.7.6.8.17 Power Plan Layout
4
DEMO-L3-EPC-1.8.7.6.8.18 Lighting Layout
4
DEMO-L3-EPC-1.8.7.6.8.19 Electrical Study - Protective Device Coordination Study
2
DEMO-L3-EPC-1.8.7.6.8.2 Calculation - Electrical Cable Sizing
2
DEMO-L3-EPC-1.8.7.6.8.20 Electrical Study - Arc Flash
2
DEMO-L3-EPC-1.8.7.6.8.21 Electrical Study - UPS Sizing
2
DEMO-L3-EPC-1.8.7.6.8.4 Cable Tray Layout
4
DEMO-L3-EPC-1.8.7.6.8.5 Power Installation Details
4
DEMO-L3-EPC-1.8.7.6.8.6 MTO - Bulk Material
2
DEMO-L3-EPC-1.8.7.6.8.7 Electrical Cable Schedule
3
DEMO-L3-EPC-1.8.7.6.8.8 Calculation Report - Lighting
3
DEMO-L3-EPC-1.8.7.6.8.9 Electrical Load List
3
▾ DEMO-L3-EPC-1.8.7.7 DEMO-L3-EPC-1.8.7.7
203
▾ DEMO-L3-EPC-1.8.7.7.1 DEMO-L3-EPC-1.8.7.7.1
181
DEMO-L3-EPC-1.8.7.7.1.1 General Activities
3
DEMO-L3-EPC-1.8.7.7.1.10 Specification - Field Instrumentation
3
DEMO-L3-EPC-1.8.7.7.1.11 Specification - Instrumentation for Package Equipments
3
DEMO-L3-EPC-1.8.7.7.1.12 Specification - Relief Valves and Rupture Disks
3
DEMO-L3-EPC-1.8.7.7.1.13 Level Sketches
4
DEMO-L3-EPC-1.8.7.7.1.14 Datasheet - Pressure Gauges
4
DEMO-L3-EPC-1.8.7.7.1.15 Datasheet - Electronic Transmitters
4
DEMO-L3-EPC-1.8.7.7.1.16 Datasheet - Temperature Gauges
4
DEMO-L3-EPC-1.8.7.7.1.17 Datasheet - Relief Valves and Rupture Disks
4
DEMO-L3-EPC-1.8.7.7.1.18 Datasheet - Level Gauges
4
DEMO-L3-EPC-1.8.7.7.1.19 Datasheet - Coriolis Flow Meter
4
DEMO-L3-EPC-1.8.7.7.1.2 Instrumentation Design Basis
2
DEMO-L3-EPC-1.8.7.7.1.20 Datasheet - Orifice Flow Meter
4
DEMO-L3-EPC-1.8.7.7.1.21 Datasheet - Radar Type Level Transmitter
4
DEMO-L3-EPC-1.8.7.7.1.22 Datasheet - Control Valves
4
DEMO-L3-EPC-1.8.7.7.1.23 Datasheet - On/Off Valve / Shutdown Valve
4
DEMO-L3-EPC-1.8.7.7.1.24 Datasheet - Analyzers
4
DEMO-L3-EPC-1.8.7.7.1.25 MCT Layouts
4
DEMO-L3-EPC-1.8.7.7.1.26 RFQ - Safety Instrumentated System
4
DEMO-L3-EPC-1.8.7.7.1.27 Specification - Safety Requirements
3
DEMO-L3-EPC-1.8.7.7.1.28 Control Schematics
4
DEMO-L3-EPC-1.8.7.7.1.29 Cause & Effect Diagram - DCS
4
DEMO-L3-EPC-1.8.7.7.1.3 Instrumentation Index
4
DEMO-L3-EPC-1.8.7.7.1.30 Cause & Effect Diagram - SIS
4
DEMO-L3-EPC-1.8.7.7.1.31 RFQ - Control Valves
4
DEMO-L3-EPC-1.8.7.7.1.32 RFQ - Actuated On/Off Valves
4
DEMO-L3-EPC-1.8.7.7.1.33 RFQ - Pressure Gauges
4
DEMO-L3-EPC-1.8.7.7.1.34 RFQ - Electronic Transmitters
4
DEMO-L3-EPC-1.8.7.7.1.35 Specification - Distributed Control System
3
DEMO-L3-EPC-1.8.7.7.1.36 Technical Bid Evaluation
15
DEMO-L3-EPC-1.8.7.7.1.37 Instrument Loop Drawings
1
DEMO-L3-EPC-1.8.7.7.1.38 RFQ - Temperature Gauges
4
DEMO-L3-EPC-1.8.7.7.1.39 RFQ - Corolis Flow Meter
4
DEMO-L3-EPC-1.8.7.7.1.4 Instrument I/O List
4
DEMO-L3-EPC-1.8.7.7.1.40 RFQ - Level Gauge
4
DEMO-L3-EPC-1.8.7.7.1.41 RFQ - Orifice Flow Meter
4
DEMO-L3-EPC-1.8.7.7.1.42 RFQ - Radar type level Transmitter
4
DEMO-L3-EPC-1.8.7.7.1.43 Datasheet - Level Switches
4
DEMO-L3-EPC-1.8.7.7.1.44 RFQ - Analyzers
4
DEMO-L3-EPC-1.8.7.7.1.45 RFQ - Relief Valves and Rupture Disks
4
DEMO-L3-EPC-1.8.7.7.1.46 RFQ - Level Switches
4
DEMO-L3-EPC-1.8.7.7.1.5 Instrument Cable Schedule
4
DEMO-L3-EPC-1.8.7.7.1.6 Instrument Cable Block Diagram
4
DEMO-L3-EPC-1.8.7.7.1.7 Specification - Safety Instrumentated System
3
DEMO-L3-EPC-1.8.7.7.1.8 Specification - Control Valves
3
DEMO-L3-EPC-1.8.7.7.1.9 Specification - Actuated On/Off Valves
3
▾ DEMO-L3-EPC-1.8.7.7.2 DEMO-L3-EPC-1.8.7.7.2
22
DEMO-L3-EPC-1.8.7.7.2.1 Telecom Design Basis
2
DEMO-L3-EPC-1.8.7.7.2.16 Technical Bid Evaluation - Telecom System
1
DEMO-L3-EPC-1.8.7.7.2.2 Telecom Block Diagram
4
DEMO-L3-EPC-1.8.7.7.2.3 Two-Way Radio Equipment layout - Overall
4
DEMO-L3-EPC-1.8.7.7.2.4 Telecom Cable Schedule
4
DEMO-L3-EPC-1.8.7.7.2.44 RFQ - Telecom System
4
DEMO-L3-EPC-1.8.7.7.2.5 Specification - Telecom System
3